Figure 1: UHD[X][S] 75 Label Placement..................................2
Figure 2: UHD[X][S] 100-125 Label Placement.........................3
Figure 3: Clearances to Combustibles ......................................6
Figure 4: Air Flow Direction .......................................................8
Figure 5: Suspension Methods .................................................9
Figure 6: Shelf-Mounting Methods .......................................... 10
Figure 7: Wall Shelf Mounting and Suspension ...................... 10
Figure 8: Vent and Roof Detail ................................................ 13
Figure 9: Standard Vented Heater - Vertical and Horizontal
Vent Termination ...................................................... 14
Figure 10: Standard Vented Heater - Common Vertical Vent
Termination ............................................................ 15
Figure 11: Separated Combustion Heater - Vertical and
Horizontal Vent Termination ................................... 16
Figure 12: Concentric Vent Box............................................... 16
Figure 13: Concentric Vertical and Horizontal Vent
Termination - Separated Combustion Heater ......... 17
Figure 14: Gas Connection .....................................................20
Figure 15: Automatic Burner Control Sequence ......................26
Figure 16: Gas Valve for Models UHD[X][S] 75 – 125 .............26
Figure 17: Manual Reset Limit Switch .....................................29
Figure 18: LED Diagnostic Codes ...........................................29
There are references in this manual to various trademarks. All trademarks mentioned herein, whether registered or not, are the
property of their respective owners. Rapid Engineering LLC is not sponsored by or affiliated with any of the trademark or registered
trademark owners, and makes no representations about them, their owners, their products or services.
Содержание UHDX 75
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 8: ......
Страница 28: ...UHD LOW PROFILE DUCT FURNACE INSTALLATION OPERATION AND SERVICE MANUAL 20 of 45 Figure 14 Gas Connection...
Страница 42: ...UHD LOW PROFILE DUCT FURNACE INSTALLATION OPERATION AND SERVICE MANUAL 34 of 45 14 1 General...
Страница 54: ......
Страница 55: ......
Страница 56: ......
Страница 57: ......
Страница 58: ......