UHD L
OW
P
ROFILE
D
UCT
F
URNACE
I
NSTALLATION
O
PERATION AND
S
ERVICE
M
ANUAL
22 of 45
10.3 UHD[X][S] Series Internal Wiring Diagram
IMPORTANT:
For field wiring into service junction box, or if any of the original wire supplied with the heater
must be replaced, it must be replaced with wiring material having a temperature rating of at least 221° F
(105° C) and 600 V. For supply connections, use No. 14 AWG or larger wires.
Содержание UHDX 75
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 8: ......
Страница 28: ...UHD LOW PROFILE DUCT FURNACE INSTALLATION OPERATION AND SERVICE MANUAL 20 of 45 Figure 14 Gas Connection...
Страница 42: ...UHD LOW PROFILE DUCT FURNACE INSTALLATION OPERATION AND SERVICE MANUAL 34 of 45 14 1 General...
Страница 54: ......
Страница 55: ......
Страница 56: ......
Страница 57: ......
Страница 58: ......