background image

4

Maintenance

5. Exchanging the Glass Bottom

Open the lid.

Loosen and remove both thumb screws located 

at the back plate.

Carefully remove the back plate from its 

mounting position. To do this, hold the back 

plate with one hand and ensure that the 

connecting ribbon cable from the housing and 

plate (PCB board on the back) does not 

disconnect. Continue holding the back plate with 

one hand and proceed with the following steps:

Remove the glass pieces on the left and right 

sides from the post curing unit.

Next, remove the bottom glass piece.

Take a new glass bottom and place it inside the 

post curing unit.

Re-insert the glass pieces on the left and right 

sides.

Position the back plate on its mounting position 

and secure it with the two thumb screws. Verify 

that the connecting ribbon cable has not 

become disconnected. 

(If so, please see instructions on 

the right.)

Close the lid.

If the glass bottom cannot be cleaned anymore 

or if the glass bottom is damaged, it has to be 

exchanged. Dirt and cured material deflect the 

UV light so that the components will not be 

cured properly.

Hold the back plate with one hand and open the 

clasp of the ribbon cable connection on the 

sensor board.

Insert the ribbon cable into the connection point 

until it sits securely against the back of it. Ensure 

the contact points are facing upwards.

Secure the ribbon cable by locking the clasp 

connection.

Position the back plate on its mounting position 

and secure the two thumb screws again.

If the connecting ribbon cable between the 

housing and the back plate has become 

disconnected whilst exchanging the glass 

bottom, please proceed as follows to reconnect 

the cable:

Содержание RS cure

Страница 1: ...Quick Start Guide Post Curing Unit RS cure D cure P cure SHERAprint cure 3Decure...

Страница 2: ...mm XXX should not be exceeded For proper curing of the components observe the specifications of the material manufacturers For proper operation of the post curing unit keep the exposure chamber clean...

Страница 3: ...lid Fig 4 Select the operating mode by choosing either a job material or customer setting if available Press the start button to start the curing process Wait until all process steps are finished Fig...

Страница 4: ...t with a microfibre cloth moistened with glass cleaner or isopropanol Fig 3 After cleaning close the lid to protect the exposure chamber from dust and dirt Fig 4 Figure 3 Figure 4 Figure 5 Figure 6 Pa...

Страница 5: ...with the two thumb screws Verify that the connecting ribbon cable has not become disconnected If so please see instructions on the right Close the lid If the glass bottom cannot be cleaned anymore or...

Страница 6: ...sh rten der Bauteile beachten Sie bitte die Angaben der Materialher steller F r einen einwandfreien Betrieb der Nachbelich tungseinheit halten Sie bitte die Belichtungskam mer frei von Staub und ander...

Страница 7: ...Abb 4 W hlen Sie die Betriebsart indem Sie entweder einen Druckjob ein Material oder eine Kunden einstellung falls vorhanden w hlen Dr cken Sie den Start Button um den Aush rte vorgang zu starten Wart...

Страница 8: ...ger oder Isopropanol angefeuchteten Mikrofasertuch Abb 3 Schlie en Sie die Maschine nach dem Reinigen um die Belichtungskammer vor Staub und Schmutz zu sch tzen Abb 4 Bitte beachten Sie Spr hen Sie da...

Страница 9: ...auben Vergewissern Sie sich dass das Flachbandkabel nicht abgeklemmt ist Wenn ja beachten Sie bitte die Anweisungen auf der rechten Seite Schlie en Sie den Deckel Wenn der Glasboden nicht mehr gereini...

Страница 10: ...http www rapidshape de Rapid Shape GmbH Roemerstrasse 21 71296 Heimsheim Germany V01 2019 12 13 DOCR000297...

Отзывы: