LN-9259-07.1
Test Stations - Operation
19
NOTES
5. Turn on the “Applicator Trigger”.
6. Let the water flow freely through the spray head
until there is no air in the line.
7. Shut off the paint trigger.
8. Turn off “Pressure Pot” valve. Turn the Water/
Air” switch to the “Air” position.
9. Turn on the “Applicator” switch and the “Dump
Trigger” switch until all traces of water are re-
moved from the dump line.
10. Turn off “Paint Air Enable” switch to release
air through the applicator.
11. Turn off all switches and remove the applicator.
Содержание RMA-303
Страница 2: ...LN 9259 07 1...
Страница 11: ...LN 9259 07 1 Test Stations Introduction 8 NOTES...
Страница 23: ...LN 9259 07 1 Test Stations Operation 20 NOTES...
Страница 25: ...LN 9259 07 1 Test Stations Maintenance 22 NOTES...
Страница 27: ...LN 9259 07 1...