background image

 

 
 
 
 

INSTALLATION MUST BE MADE BY A LICENSED/QUALIFIED  COMMERCIAL GAS EQUIPMENT 

SERVICE AGENCY/COMPANY 

 
The input rating on your appliance is for elevations up to 2,000 feet. For elevations above 2,000 feet the rating must 
be reduced to 4% for each 1,000 feet above sea level. 

 
 
INSTALLATION, OPERATION & MAINTENANCE 
(1) 

PRE-INSTALLATION - SPACE AND GAS CONNECTIONS 

   

(a) 

The area around the appliance must be kept free and clear from combustibles. The area in front of 

and above the appliance must be clear to avoid any obstruction to the flow of combustion and ventilation air. Means 
must be provided for adequate air supply and adequate clearance from air openings into the combustion chamber. 
   

(b) 

Adequate  clearance  must  be  provided  in  front  and  sides  of  appliance  for  servicing  and  proper 

operation. 
   

(c) 

Your  appliance  is  designed  for  installation  in  a  combustible  or  non-combustible  location.  If  the 

appliance is installed in a combustible location, the following clearances must be observed: 12" to sides and 12" to 
back. If installed in a non-combustible location, the clearances are: 1" sides and 6" back. 

(2) 

INSTALLATION 

   

(a)  

The gas pressure regulator supplied with the appliance must be installed on the appliance prior to 

connection to the gas supply lines. The outlet pressure setting is 5" water column on natural gas and 10" water column 
on propane gas (LP Gas). 
   

(b) 

Connect the appliance to a gas supply line having a 3/4 inch iron pipe size or larger. If a flexible 

connector  is  used  it  must  be  3/4"  I.D.  (Domestic  range  connector  will  not  permit  proper  operation).  A  gas  shutoff 
valve must be installed in the gas supply line ahead of the appliance for future service. Use pipe sealant on all joints. 
Sealant must be resistant to the action of LP gas. A 1/8" pressure tap is provided on the gas manifold for checking the 
gas pressure. Always check pressure with all burners on and adjacent equipment operating. 
   

(c) 

Level  the  appliance  by  adjusting  feet  at  the  bottom  of  the  legs.  Leveling  is  important  for  proper 

operation and combustion. If a level is not available, use pan of water. 
   

(d) 

To check for leaks, use a soap and water solution. DO NOT USE OPEN FLAME. 

   

(e) 

The  appliance  and  its  individual  shutoff  valve  must  be  disconnected  from  the  gas  supply  piping 

system during any pressure testing of the system at test pressures in excess of 1/2 psig (3.45kPa). 
   

(f) 

The appliance must be isolated from the gas supply piping system by closing its individual manual 

shutoff valve during any pressure testing of the system at test pressure equal to or less than 1/2 psig (3.45kPa). 
 

(3) 

OPERATION 

   

(a) 

Turn off all burners and pilot valves. Wait 5 minutes. 

   

(b) 

Turn on pilot valves and light all pilots. 

   

(c) 

Adjust pilot flame by turning the pilot valve screw clockwise or counterclockwise. 

(4) 

MAINTENANCE 

   

(a) 

CLEANING 

Appliance must be cool before cleaning.

 

   

Top grates, burners, and wok rings should be cleaned periodically by wire brushing or washing in hot water 

and detergent. 
   

The  stainless  steel  front  and  trim  should  be  cleaned with  mild  soap  or  detergent  or  with a liquid cleanser 

especially for use on stainless steel. Never attempt to clean stainless steel with steel wool, abrasive cloths or powders. 
The drip tray should be emptied as needed and cleaned with hot water and soap or detergent. 

(5) 

SERVICE 

   

No immediate need for service is anticipated. Thereafter service needs vary with frequency of use. Twelve 

hours per day, seven days per week is considered heavy use and appliance should be serviced every ninety days. For 
lesser use, consider service every six months. 
 

 