12
SECTION 8
R23LT ASSEMBLY
Tilt Tower
1. Remove the Side Panel. (See Fig. 8.1)
2. Remove the Tilt Tower main Pivot Pin from the Tilt
Tower Base before starting. (See Fig. 8.2)
3. Remove the Tilt Tower Safety Pin from the Tilt Tower
Base. (See Fig. 8.3)
4. Remove the Plastic Tilt Tower Base Cover.
(See Fig. 8.4)
5. Remove the Bolts holding the Air Oil Regulator
Bracket and set the Air Oil Regulator Assembly aside.
(See Fig. 8.5)
CAUTION!
Handling of the machine must be performed only
with an appropriate lifting device such as a forklift
or shop crane. Only personnel who are experienced
and qualified on material handling procedures should
handle any transportation or moving of machine
.
6. Using a shop crane or other lifting device, lower the
Tilt Tower onto the base and align the Main Pivot Pin
holes. Take care not to damage the bottom of the Tilt
Tower or Air Line. (See Fig. 8.6)
Fig. 8.1
Fig. 8.2
Fig. 8.3
Fig. 8.4
Fig. 8.5
Fig. 8.6