Range Road Enterprises Ltd
Box 944
Eckville AB T0M 0X0
www.range-road.ca
Figure P: Adjustment Bolts
NOTE: Adjust Blade again after replacement. Refer to Figure P for the following instructions: BEFORE any
adjustment, loosen Bolts 96A and 96B and Nuts 98A and 98B.
If after replacement Blade starts to shift back towards operator, loosen Nut 98C and hold Bolt 99 with a
wrench. Then tighten Nut 98C after adjustment.
Continue making small adjustments until the Blade stays centered. AFTER any adjustment, tighten Bolts 96A
and 96B and nuts 98A and 98B.
39) Install Throttle control (40) on Push Handle (46) as shown in Figure Q.
Figure Q: Throttle Control
Содержание RR5026
Страница 30: ...Range Road Enterprises Ltd Box 944 Eckville AB T0M 0X0 www range road ca Parts List...
Страница 31: ...Range Road Enterprises Ltd Box 944 Eckville AB T0M 0X0 www range road ca...
Страница 32: ...Range Road Enterprises Ltd Box 944 Eckville AB T0M 0X0 www range road ca...
Страница 33: ...Range Road Enterprises Ltd Box 944 Eckville AB T0M 0X0 www range road ca...
Страница 34: ...Range Road Enterprises Ltd Box 944 Eckville AB T0M 0X0 www range road ca...