Installing the Tub (continued)
Step #7:
Set tub back into place, re-check level.
Make sure the unit is level prior to fastening to the floor.
Do not over tighten the floor connections. This could cause the unit to be un-level.
Step #8:
Make drain connection from sanitary tee on tub to facility drain.
If mobile lifts are to be used for transferring patients, verify that the lift base
clears the drain connection. If possible damage might occur to drain area, you
must install blocking or a stop to prevent contact between lift base and plumbing.
Step #9:
If tub has an air spa blower, plug the electrical cord into the GFI Outlet.
Step #10:
Attach any accessories, including shower wand and disinfect hose assembly as shown below.
The shower hose is concealed inside tub, and can be pulled out.
Step #11:
Test unit for proper operation. Be sure to clean inside of tub prior to filling unit. Excess debris
may damage the air blower. Check the unit for any leaks.
Step #12:
Remove any installation labels and directions. Clean tub and prepare for daily use with warm
water and non-abrasive cleaner.
NOTE: The thorough inspection and startup of the tub is required before first use. It is the
installer’s responsibility to check for and tighten as necessary threaded connections on all parts of
tub as part of this start-up procedure.
____________________________________________________________________________________________
RANE
RK12 Page 3.3
Section
3
Attach Shower
Wand Here
Attach Disinfect Hose
Assembly Here