Getting Started
R&S
®
ZNL/ZNLE
23
User Manual 1178.5966.02 ─ 19
4
Getting Started
4.1
Preparing for use
Here, you can find basic information about setting up the product for the first time.
..................................................................................................23
.........................................................................................23
.................................................................................... 23
................................................................................24
............................................................................................... 26
..................................................................................................30
........................................................................................... 31
Connecting an external monitor
.............................................................................. 31
..................................................................................... 33
................................................................................ 36
.................................................................................. 37
4.1.1
Lifting and carrying
The carrying handles are designed to lift or carry the instrument. Do not apply exces-
sive external force to the handles.
See
"Lifting and carrying the product"
4.1.2
Unpacking and checking
1. Unpack the R&S
ZNL/ZNLE carefully.
2. Retain the original packing material. Use it when transporting or shipping the
R&S
ZNL/ZNLE later.
3. Using the delivery notes, check the equipment for completeness.
4. Check the equipment for damage.
If the delivery is incomplete or equipment is damaged, contact Rohde
&
Schwarz.
4.1.3
Choosing the operating site
Specific operating conditions ensure proper operation and avoid damage to the prod-
uct and connected devices. For information on environmental conditions such as ambi-
ent temperature and humidity, see the data sheet.
Preparing for use