Preparing for Use
R&S
®
SMCV100B
15
Getting Started 1432.7046.02 ─ 02
4
Preparing for Use
This chapter describes the basic steps to be taken when setting up the product
for the first time.
4.1
Lifting and Carrying
See also
"Lifting and carrying the product"
For mounting the R&S
SMCV100B in a rack, see
4.2
Unpacking and Checking
1. Unpack the R&S
SMCV100B carefully.
2. Retain the original packing material. Use it to protect the control elements and
connectors when transporting or shipping the R&S
SMCV100B later.
See also chapter "Transporting" in the user manual.
3. Using the delivery notes, check the equipment for completeness.
4. Check the equipment for damage.
If the delivery is incomplete or equipment is damaged, contact
Rohde
&
Schwarz.
4.3
Choosing the Operating Site
Specific operating conditions ensure accurate measurements and avoid damage
to the product and connected devices. For information on environmental condi-
tions such as ambient temperature and humidity, see the data sheet.
See also
Choosing the Operating Site