background image

 

 

R&G Racing 

Unit 1, Shelleys Lane, East Worldham, Alton, Hampshire GU34 3AQ. 

Tel: +44 (0)1420 89007 Fax +44 (0)1420 87301 

www.rg-racing.com 

Email: 

[email protected]

 

PAGE 9 OF 22 

 

 

 

 

 

 

LP0273

 

 

 

 

 

                                                                                                                             

 

 

If fitting OEM Indicators 

• 

Fit one indicator spacer (item 4 – I0032) to both rubber indicator mounts, as shown in 

picture 18, before fitting into the large slot on either side of the tail tidy, ensuring the shal-
lower side of the rubber mount is on the inside. 

• 

Take the OEM indicator, and feed the wiring through the hole in the rubber mount, before 

sliding the metal bracket onto the wiring in the same way as it was removed from the bike, 
as shown in picture 19. 

• 

Once fitted, fit the domed nut and tighten to secure the indicator in place, as shown in 

picture 20. 

• 

Repeat the above process for both indicators. 

• 

With the indicators of choice fitted, feed the wiring through the two holes on either spar of 

the tail tidy, as shown in pictures 21 & 22 and feed the indicator and licence plate illuminator 
wiring up through the exposed hole on the underside of the tail bodywork. Use the cable ties 
and self-adhesive cable clips supplied to route the wiring neatly.
 

• 

Take the three connectors supplied (item 15 – CON0009) and connect one from the li-

cence plate illuminator to the OEM connector (if illumination fails, reverse the bullet connect-
ors).
 

• 

Fit the remaining two connectors to the indicator wiring as below: 

• 

If fitting R&G Aero Indicators with LED’s the yellow wire on the Aero Indicators connects 

with the black wire on the CON0009 and the black wire on the Mini Indicators connects with 
the red wire on the CON0009. 1x set of RGR0001 & RGR0002 resistors (mounted inline) 
(available separately) are required to achieve the correct flash rate. 

• 

If fitting R&G Mini Indicators with bulbs, the black wire on the Mini Indicators connects 

with the black wire on the CON0009 and the black/white wire on the Mini Indicators connects 
with the red wire on the CON0009. 

• 

If fitting R&G LED Mini Indicators, the black wire on the Mini Indicators connects with the 

red wire on the CON0009 and the black/white wire on the Mini Indicators connects with the 
black wire on the CON0009. 1x set of RGR0001 & RGR0002 resistors (mounted inline) 
(available separately) are required to achieve the correct flash rate. 

• 

Connect each connector up to the OEM wiring and check for the correct operation of all 

lights. 

• 

Neatly secure the wiring within the tail unit using the cable ties supplied. 

Re-fit the pillion seat. 

• 

Ensure the tail tidy is securely mounted and all bolts are fully tightened. 

• 

Re-fit the licence plate (it may require drilling). 

ISSUE 2 20/09/2019 (FB) 

Содержание LP0273

Страница 1: ...sed to hold components onto bolts these rubber washers can be thrown away THIS KIT CONTAINS THE ITEMS PICTURED AND LABELLED OVER PAGE SOME PARTS MAY BE SHOWN FOR CLARITY OF INSTRUCTIONS ONLY DO NOT PR...

Страница 2: ...BOLT 40Nm M12 BOLT 40Nm ITEM NO DESCRIPTION QTY ITEM 1 LA0002 No PLATE LIGHT inc 1 ITEM 2 LICENCE PLATE BRACKET TB0198 Part 2 1 ITEM 3 INDICATOR ADAPTORS I0031 4 ITEM 4 INDICATOR SPACERS I0032 2 ITEM...

Страница 3: ...R G Racing Unit 1 Shelleys Lane East Worldham Alton Hampshire GU34 3AQ Tel 44 0 1420 89007 Fax 44 0 1420 87301 www rg racing com Email info rg racing com PAGE 3 OF 22 LP0273 ASSEMBLY DIAGRAM...

Страница 4: ...73 R G Racing Unit 1 Shelleys Lane East Worldham Alton Hampshire GU34 3AQ Tel 44 0 1420 89007 Fax 44 0 1420 87301 www rg racing com Email info rg racing com Picture 1 Picture 2 Picture 6 Picture 3 Pic...

Страница 5: ...Shelleys Lane East Worldham Alton Hampshire GU34 3AQ Tel 44 0 1420 89007 Fax 44 0 1420 87301 www rg racing com Email info rg racing com PAGE 5 OF 22 LP0273 Picture 8 Picture 12 Picture 11 Picture 9 Pi...

Страница 6: ...R G Racing Unit 1 Shelleys Lane East Worldham Alton Hampshire GU34 3AQ Tel 44 0 1420 89007 Fax 44 0 1420 87301 www rg racing com Email info rg racing com Picture 13 Picture 18 Picture 17 Picture 16 Pi...

Страница 7: ...g Unit 1 Shelleys Lane East Worldham Alton Hampshire GU34 3AQ Tel 44 0 1420 89007 Fax 44 0 1420 87301 www rg racing com Email info rg racing com PAGE 7 OF 22 LP0273 Picture 19 Picture 20 Picture 22 Pi...

Страница 8: ...our M6 x 6mm button head bolts item 6 and four M6 washers item 5 as shown in pictures 10 11 by fitting the bolts from behind as shown Take the R G licence plate illuminator item 1 LA0002 and fit the s...

Страница 9: ...rom the li cence plate illuminator to the OEM connector if illumination fails reverse the bullet connect ors Fit the remaining two connectors to the indicator wiring as below If fitting R G Aero Indic...

Страница 10: ...ing that the warranty on the motorcycle is not affected by the fitting of the Products On return of any defective Products R G shall at its option either supply a replacement or refund the purchase mo...

Страница 11: ...CES RONDELLES DOIVENT TRE JET ES LE KIT CONTIENT LES ARTICLES EN PHOTO ET ETIQUETTES SUR LA PAGE LES PARTIES PRESENT ES PEUVENT ETRE UNIQUEMENT REPRESENTATIVES POUR LA CLARTE DES INSTRUCTIONS NE PAS P...

Страница 12: ...PTION QTE ARTICLE 1 LA0002 No FEU DE PLAQUE inc 1 ARTICLE 2 SUPPORT DE PLAQUE TB0198 Partie 2 1 ARTICLE 3 ADAPTATEUR DE CLIGNOTANT I0031 4 ARTICLE 4 ENTRETOISES DE CLIGNOTANT I0032 2 ARTICLE 5 M6 ROND...

Страница 13: ...R G Racing Unit 1 Shelleys Lane East Worldham Alton Hampshire GU34 3AQ Tel 44 0 1420 89007 Fax 44 0 1420 87301 www rg racing com Email info rg racing com PAGE 13 OF 22 LP0273 SCHEMA DE MONTAGE...

Страница 14: ...le au support de plaque d immatric ulation R G article 2 TB0198 Partie 2 l aide des quatre boulons t te ronde M6 x 6mm article 6 et des quatre rondelles M6 article 5 comme indiqu sur les photos 10 et...

Страница 15: ...eu de plaque au connecteur d origine si l clairage choue inversez les connecteurs Branchez les deux connecteurs restants au c blage de clignotant comme indiqu ci dessous Si vous utilisez des clignotan...

Страница 16: ...en disturbed The Buyer is responsible for ensuring that the warranty on the motorcycle is not affected by the fitting of the Products On return of any defective Products R G shall at its option either...

Страница 17: ...ZUERST DASS ALLE TEILE VORHANDEN SIND LESEN SIE DIE MONTAGEANLEITUNG KOMPLETT DURCH BEVOR SIE ANFANGEN WENN SIE BEI DER MONTAGE DIESES PRODUKTES UNSICHER SIND BITTE EINEN UNSERER H NDLER KONTAKTIEREN...

Страница 18: ...RAUBE 40Nm ARTIKEL NR BESCHREIBUNG MENGE ARTIKEL 1 LA0002 KENNZEICHENBELEUCHTUNG 1 ARTIKEL 2 KENNZEICHENHALTER TB0198 Teil 2 1 ARTIKEL 3 ADAPTER F R DIE BLINKER I0031 4 ARTIKEL 4 DISTANZHALTER F R DIE...

Страница 19: ...R G Racing Unit 1 Shelleys Lane East Worldham Alton Hampshire GU34 3AQ Tel 44 0 1420 89007 Fax 44 0 1420 87301 www rg racing com Email info rg racing com PAGE 19 OF 22 LP0273 ZEICHNUNG ZUSAMMENBAU...

Страница 20: ...Hutmutter die entfernt wurden sind in Abbildung 9 abgebildet Nehmen Sie die R G Montagehalterung Artikel 8 TB0198 Teil 1 und montieren Sie sie am R G Kennzeichenhalter Artikel 2 TB0198 Teil 2 mit den...

Страница 21: ...wie in Abbildung 20 abgebildet Diese Schritte an beiden Blinkern ausf hren Nachdem Sie die Blinker Ihrer Wahl montiert haben f hren Sie die Kabel durch die zwei ffnungen auf jeder Seite des Kennzeiche...

Страница 22: ...Sie die Kabelbinder um die Kabel ordentlich im Heck zu verstauen Montieren Sie die Beifahrersitz wieder berpr fen Sie dass der Kennzeichenhalter ordnungsgem montiert wurde und alle Schrauben festgezog...

Отзывы: