Operation - Page 25
COPYRIGHT © 2013 SANDVIK MINING AND CONSTRUCTION OY
Optional equipment
RD2019 A-JAW, D-JAW, S-JAW, M-JAW
Note: Both jaws of pair have specific toothing which means each pair of jaws has
A and B jaw. Do not install two A jaws or two B jaws at the same time.
1. Place the cutter-crusher on the first free assembling stand.
2. Remove the lower jaw and lift the cutter-crusher up. The cylinder weight will
force the upper jaw against the stopper (maximum opening).
Note! Use lifting straps to prevent the cutter-crusher from rotating. Do not rely
on the hydraulics!
Note! Be very careful when lifting the cutter-crusher. Do not tilt the cutter-
crusher when lifting.
3. Lower the cutter-crusher on the second assembling stand and install the lower
jaw.
4. Make sure that the toothing of the jaws is aligned correctly.
Note! Do not operate the cutter-crusher jaws/cylinder with different pair
of jaws!
M010068
A
B
A
B
M010069
A
B
B
A
M010070
A
B
B
A
Содержание A-Jaw
Страница 40: ...COPYRIGHT 2013 SANDVIK MINING AND CONSTRUCTION OY Page 40 Operation Operation RD2019 A JAW D JAW S JAW M JAW ...
Страница 85: ...Page 85 COPYRIGHT 2013 SANDVIK MINING AND CONSTRUCTION OY ...
Страница 86: ...COPYRIGHT 2013 SANDVIK MINING AND CONSTRUCTION OY Page 86 ...
Страница 87: ...Page 87 COPYRIGHT 2013 SANDVIK MINING AND CONSTRUCTION OY ...