COPYRIGHT © 2013 SANDVIK MINING AND CONSTRUCTION OY
Page 38 - Operation
Operation
RD2019 A-JAW, D-JAW, S-JAW, M-JAW
2. Connect hoses. An installation inspection must be carried out after the product
has been mounted on the carrier. In the installation inspection certain
specifications (operating pressure, oil flow, etc.) are checked so that they are
within given limits. See “Product specifications” on page 78.
3. Open the ball valves.
4. Remove air from the hoses by carefully operating the crusher cylinder. Open
and close empty jaws several times.
6.4 MOVEMENT
The transportation and parking positions are shown below. When moving the
carrier, ensure that the crusher is not too close to the carrier.
6.5 SPECIAL CONDITIONS OF USE
The equipment may require modifications, special operating techniques, increased
maintenance or special wear items if it is used in conditions that differ from normal
breaking or demolition work. Special conditions of use are:
■
Operations in extremely low or high temperatures
■
Use of special hydraulic fluids
■
Operations with special carrier
■
Other special conditions
Содержание A-Jaw
Страница 40: ...COPYRIGHT 2013 SANDVIK MINING AND CONSTRUCTION OY Page 40 Operation Operation RD2019 A JAW D JAW S JAW M JAW ...
Страница 85: ...Page 85 COPYRIGHT 2013 SANDVIK MINING AND CONSTRUCTION OY ...
Страница 86: ...COPYRIGHT 2013 SANDVIK MINING AND CONSTRUCTION OY Page 86 ...
Страница 87: ...Page 87 COPYRIGHT 2013 SANDVIK MINING AND CONSTRUCTION OY ...