Operation - Page 37
COPYRIGHT © 2019 SANDVIK MINING AND CONSTRUCTION OY
Operation
2155E STD
5. Remove bucket pins and other parts.
6. If you have to check or remove hose connections in the hammer, remove shield
plate by pulling it out of the housing. Then you can reach to the connections.
7. The carrier can be moved aside.
INSTALLATION
1. Install hammer in the same manner as mounting a bucket. Install bucket pins.
2. Connect hoses. Hammer inlet port is marked on the valve body with "IN" and
outlet port with "OUT". An installation inspection must be carried out after the
product has been mounted on the carrier. In the installation inspection certain
specifications (such as operating pressure, oil flow) are checked so that they are
within given limits. See “Hammer specifications” on page 70.
3. Open hammer inlet and outlet lines.
R0102
8
6
Содержание 2155E
Страница 1: ...Original instructions 9 19 OPERATOR S MANUAL OM2155ESENG 919 HYDRAULIC HAMMER RAMMER 2155E STD ...
Страница 3: ...Operation Page 3 COPYRIGHT 2019 SANDVIK MINING AND CONSTRUCTION OY 2155E STD OPERATION ...
Страница 40: ...COPYRIGHT 2019 SANDVIK MINING AND CONSTRUCTION OY Page 40 Operation Operation 2155E STD ...
Страница 41: ...Lubrication Page 41 COPYRIGHT 2019 SANDVIK MINING AND CONSTRUCTION OY 2155E STD LUBRICATION ...
Страница 56: ...COPYRIGHT 2019 SANDVIK MINING AND CONSTRUCTION OY Page 56 Lubrication Carrier hydraulic oil 2155E STD ...
Страница 57: ...Maintenance Page 57 COPYRIGHT 2019 SANDVIK MINING AND CONSTRUCTION OY 2155E STD MAINTENANCE ...
Страница 69: ...Specifications Page 69 COPYRIGHT 2019 SANDVIK MINING AND CONSTRUCTION OY 2155E STD SPECIFICATIONS ...
Страница 77: ...Page 77 COPYRIGHT 2019 SANDVIK MINING AND CONSTRUCTION OY ...
Страница 78: ...COPYRIGHT 2019 SANDVIK MINING AND CONSTRUCTION OY Page 78 ...
Страница 79: ...Page 79 COPYRIGHT 2019 SANDVIK MINING AND CONSTRUCTION OY ...