13
2021 RALE® ST120 INSTALLATION GUIDE
Break-in:
The RALE Track Kit will have a break-in period where everything will
settle in. After one hour of riding check the following, and perform
tasks as listed in the maintenance schedule on page 14 and as
described on page 15.
Re-torque all bolts (shown below) repeat on opposite side of RALE
Track Kit. See the parts diagrams for torque specs.
Re-torque (4) nuts on the brake hub (shown below). See the parts
diagram for torque spec.
NOTE:
Because the hub is threaded, it is
not necessary to hold onto the bolt-head when re-torquing.
4X
200 IN-LB
200 IN-LB
200 IN-LB
200 IN-LB
30 FT-LB
40 FT-LB
50 FT-LB
50 FT-LB
50 FT-LB
160 IN-LB
Содержание ST120 2021
Страница 1: ...2 0 2 1 S T 1 2 0 U S E R S M A N U A L...
Страница 2: ...2021 RALE ST120 USER S MANUAL Revision C Release 1 13 2021 TD 32100...
Страница 7: ......
Страница 8: ...2021 RALE ST120 INSTALLATION GUIDE 4 USER S GUIDE...
Страница 10: ...2021 RALE ST120 INSTALLATION GUIDE 6 22 21 20 19 18 17 12 11 10 9 8 7 6 5 4 3 2 1 15 14 23 13 16...
Страница 20: ...2021 RALE ST120 INSTALLATION GUIDE 16 PART DIAGRAMS...
Страница 46: ...WARRANTY...