INSTALLATION GUIDE
CONTENTS
Installation guide
2
General
2
Chimney
2
Technical data
3
Specifications
3
Scale drawings
4
Rating plates
7
Installation
8
Packaging at the time of delivery
8
Removing transport locks from a stove with a swivel base 9
Disposing of packaging
9
Installation distances
10
Installation of floor plate
14
Adjusting the height
14
Installing/replacing handles
14
Installing a flue collar in the top outlet
15
Altering the chimney connection (flue collar)
16
Installing the top plate
18
Removing the combustion chamber lining
19
Removing the smoke chicane
21
External air connection – AirSystem
22
Lubricating hinges
25
Accessories
26
Spare parts list
28
Test certificate
30
Declaration of performance
31
We reserve the right to correct any printing errors.
GB
GB
GB - 1
GB
Содержание NEXO Series
Страница 13: ...12 GB GB...
Страница 31: ...30 GB GB...
Страница 32: ...DECLARATION OF PERFORMANCE DECLARATION OF PERFORMANCE GB 31 GB...
Страница 33: ...32 GB GB...