
4/5
8. Gently insert greased end
cap into the RO pressure
vessel. Push it all the way
until you have full access
to the internal groove that
holds the retaining plates.
9. Install the retaining plates and bolts as they
were before. The end of your pressure
vessels will appear as shown.
10. Cut your green brine hose as close as
possible to the blue spine in the RO
assembly. Connect it to the pushfit on the
new pressure valve / gauge control
assembly as shown.
11. Optional step: There is no harm to leave the existing internals from the blue plastic spine in
place and unused. If you wish to remove the now unused components, cut the two remaining
cable tie straps that hold the two pressure vessels together. Remove the blue plastic spine and
loosen the phillips screws to remove all internals. Screw the blue spine back together and
replace into the centre between the two pressure vessels. Strap with new cable tie straps.