
53
ESP-LX+ & LXi+ Installation, Programming, & Operation Guide
Station Valve Wiring
Connect each valve by its own separate power wire to one of
the numbered terminals on the ESP-LX+ terminal strip, as
shown in the illustration. You may connect up to two 24 VAC,
7VA solenoid valves per station. You may use the special Valve
Test position to help identify valve stations BUT NOT for
permanent connections.
To speed up installation, slide the stripped end of the valve
wire under the pinch plate at each terminal. The pinch plate
eliminates the need to wrap the wire around the screw head.
NOTE
: The ESP-LX+ 20- and 24-station models have
a special screwless terminal strip for valve wire
connections.
Connect a common wire to one of the leads on each valve.
Connect the other end of the common wire to the COM terminal
on the flip strip. Wire used to connect the valves must be code-
approved for underground installation.
Master Valve Wiring
NOTE
: Complete this section
only
if your system
requires a master valve (an automatic valve installed
on the mainline pipe upstream from the station valves)
or a pump relay. The controller does NOT provide
main power for a pump. Connect the master valve
wiring to the MV terminal and COM terminal as
shown in the illustration.
Содержание ESP-6LX+
Страница 6: ...3 ESP LX LXi Installation Programming Operation Guide Station Layout...
Страница 12: ...9 ESP LX LXi Installation Programming Operation Guide F or E S P LX a nd LX i C on trollers D...
Страница 50: ...47 ESP LX LXi Installation Programming Operation Guide...
Страница 52: ...49 ESP LX LXi Installation Programming Operation Guide...
Страница 72: ...69 ESP LX LXi Installation Programming Operation Guide NOTES...