4
RailKing N&W J Steam Engine
Connecting the Transformer
The Z-750
®
power supply included with this set provides an easy-to-use, safe
power source for AC-powered trains and accessories.
Plug the wire from the transformer into the remote lock-on’s center port, then
plug the transformer into the wall outlet. Insert two AA batteries (not
included) into the remote handheld.
Lubricating the Engine
You must lubricate the engine before operating it. Use a light household oil
and follow the lubrication points marked “L” in Fig. 9 on Page 14. Do not
over oil. Use only a drop or two on each
pivot point.
Priming the Smoke Unit
You should prime the smoke unit with
smoke fluid before operating. Add 15-20
drops of smoke fluid from the included
pipette through the smokestack (see figure
4), then gently blow into the stack to
eliminate any air bubbles in the fluid.
Add Smoke Fluid
Through Smokestack
Figure 4. add Smoke Fluid
Through the Smoke Stack
Align Quick Connect
Plugs and Gently Push
RealTrax® Sections Together
Figure 2: Preparing to snap RealTrax®
sections together by aligning Quick
Connect Connectors together.
Figure 3: RealTrax® sections in properly
connected position.