![RadiSys C1XTN02 Скачать руководство пользователя страница 26](http://html.mh-extra.com/html/radisys/c1xtn02/c1xtn02_service-manual_780527026.webp)
Chapter 2: 6 Steps to Operation
Service Manual
15
Figure 6. Installing the SCB
Step 3:
Tighten the captive
fasteners on the
I/O panel (4 places).
Step 1:
Insert the EPC-3221
into the chassis
subrack.
Step 2:
Simultaneously lock
the injector/ejector levers
on the I/O panel (2 places).
Captive
Fasteners
(4 places)
Alignment
Hole
(Upper/Lower)
Subrack Front
Rails
(Upper/Lower)
Card Guide Rails
(Upper/Lower)
CompactPCI
Passive
Backplane
EPC-3221 System
Controller Board
(shown with optional
CPBRI01Bridge
Card installed)
Lower
Injector/Ejector
Levers
Injector/Ejector
Levers
(Upper/Lower)
Upper
Alignment Pins
Chassis Subrack
Refer to the more detailed SCB
installation instructions on
page 14
.
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com