44
Radijator Inženjering d.o.o, 36000 Kraljevo, Živojina Lazića - Solunca br.6, Srbija
tel. +381 36 399 140, fax. +381 36 399 150, http://www.radijator.rs
e-mail: [email protected]
3. Installing
3.1
General warnings
The boiler must be properly installed to work properly!
UNI 25 boiler is intended to work on central heating installations with an
operating pressure of up to 2.5 bars and a maximum operating temperature of
85 degrees Celsius.
The boiler door has to be closed during its operation..
UNI 25 boiler comes with the fan, automatic controls, and the motor and all
devices use the power supply of 230V, therefore installing improperly and
handling carelessly may endanger human life with a possible electric shock.
As a fuel, it uses only pellets.
During the installation, please consider its weight..
During the installation, stick to the law-regulated norms and regulations
designed for the installation of a wood water boiler with the hot water generator,
and which apply in the country where the device is installed. On the contrary,
Radiator inzenjering as the manufacturer doesn’t take any responsibility for the
consequences of such installing.
In the case of certain construction changes, particularly on safety devices, lead to
unwanted consequences that can impair a person’s health and even endanger life
Radiator inzenjering doesn’t take any responsibility.
The device has to work with all completely functional safety devices listed and
described in the following text. Glass-ceramic on the door and every smoke
channel have to be in perfect condition. Perform the maintenance of safety
devices exclusively upon consulting licensed persons by the manufacturer or
contact the manufacturer directly.
Radijator inženjering, as the boiler’s manufacturer doesn’t take any responsibility
for damages caused by improper installing.
*
All national and local regulations and the European standard have to be met during the
installation of the boiler.