Installation Manual 

Gas Fire Heater  – Cod. 99962NA – November  2002

 

 

GENERAL INSTALLATION REQUIREMENTS 

 

GAS SAFETY 

 
It is the law that all gas appliances are installed by a CORGI registered installer (you can check this by contacting corgi on 
01256.372200) in accordance with the regulations listed below.  Failure to install appliances correctly could lead to prosecution.  It is in 
your own interest and that of safety to ensure that the law is complied with.  Failure to have your appliance installed to comply with the 
installation instructions and the requirements listed below could invalidate your guarantee. 
 

RELATED DOCUMENTS 

The installation of the boiler must be in accordance with the relevant requirements of the Gas Safety regulations, Building regulations, 
I.E.E. regulations and the bylaws of the local water authority. 
It should be in accordance also with any relevant requirements of the local authority and the relevant recommendations of the following 
British Standard Codes of Practice: 
 
 

B.S 6400: 

1985  & B.S. 6891 : 1988. 

 

BS 5376: 

Selection and Installation of Gas Space Heating ( 1 and 2 family gases) 

 

 

Part 2: Boilers of rated input not exceeding 60 Kw 

 

BS 5449: 

Central Heating for domestic premises 

 

 

Part 1: Forced circulation Hot Water System 

 

CP 342: 

Centralised Hot Water Supply BS 6700 : 

1987 

 

 

Part 2: Buildings other than individual 

 

BS 5440: 

Flues and air supply for Gas Appliances of rated input not exceeding 

 

 

60 Kw (1 and 2 family gases) 

  

Part 

1: 

Flues 

 

 

Part 2: Air Supply 

 

BS 5446: 

1990:  Installation of Gas Hot Water supplies for domestic purposes 

 

GAS SUPPLY 

Service Pipes:  The local gas region should be consulted at the installation planning stage in order to establish the availability of supply 
of gas.  An existing service pipe must not be used without prior consultation with the local gas region. 
Meters:  A gas meter is connected to the service pipe by the local gas region or local gas region contractor. An existing meter should be 
checked to ensure that it is capable of passing an additional 3.4 m3/hr (125 ft/hr)  before the appliance is installed.  The meter outlet 
governor should ensure a nominal dynamic pressure of 20m Bar, (8 in wg) at the boiler.  Installation pipes should be fitted in 
accordance with BS6891.1988.  

Pipework that supplies the boiler must be a 22 mm. ininterrupted supply from meter to the 

isolation cock of the boiler.

 The complete installation must be tested for soundness as described in the above code, BS 6400: 1985 & 

BS6891. 
 
IMPORTANT:  BOTH THE USER AND THE MANUFACTURER RELY UPON THE INSTALLER, WHOSE JOB IS TO INSTALL THE 
BOILER AND CONNECT IT TO A CORRECTLY DESIGNED HEATING SYSTEM.  THE INSTALLER SHOULD ACQUAINT HIMSELF 
WITH THE CONTENTS OF THIS PUBLICATION AND THE RELEVANT BRITISH STANDARDS CONCERNING INSTALLATION 
REQUIREMENTS. 
 

LOCATION OF BOILER 

In siting the combination boiler, the following limitations MUST be observed: 
The position selected for installation should be within the building, and MUST allow  
adequate space for installation, servicing and operation of the combination boiler, and for air circulation around it. The boiler is not 
suitable for external installation. 
This position MUST also allow for a suitable flue termination to be made.  The boiler must be installed on a flat vertical wall which is 
capable of supporting the weight of the combination boiler, and any ancillary equipment. 
If  the boiler is to be fitted in a timber framed building it should be fitted in accordance with the British Gas publication "Guide for Gas 
Installations in Timber Frame Housing, Reference IGE/UP/6. If in doubt, advice must be sought from the local  region of British Gas. 
The boiler may be installed in any room or internal space, although particular attention is drawn to the requirements of the current I.E.E. 
Wiring Regulations, and in Scotland the electrical provisions of the Building Regulations applicable in Scotland, with respect to the 
installation of the boiler in a room or internal space containing a bath or shower. 
Where a room-sealed appliance is installed in a room containing a bath or shower, any electrical switch or appliance control utilising 
mains electricity must be so situated that it cannot be touched by a person using the bath or shower. 
A compartment used to enclose the combination boiler MUST be designed and constructed specifically for this purpose.  An existing 
cupboard, or compartment, may be used provided it is modified accordingly. 

Содержание SF 16 E

Страница 1: ...CE 0694 ENGLISH Technical Specification RADIANT BRUCIATORI S p A Montelabbate PU ITALY By Technical Department INSTALLATION AND MAINTENANCE MANUAL FOR GAS FIRED HEATER Model SF 16 E TYPE C ROOM SEALED...

Страница 2: ......

Страница 3: ...EM page 3 GENERAL INSTALLATION REQUIREMENTS page 5 BOILER INSTALLATION page 6 GAS OPERATIONS AND ADJUSTMENTS page 8 REGULATING THE GAS PRESSURE page 9 ELECTRICAL CONNECTIONS page 10 12 BOILER CONTROL...

Страница 4: ...h an expansion vessel 2 WARNINGS REGARDING INSTALLATION Warranty expires 12 months from date of installation and in all cases no later than 18 months from date of construction First start up must be p...

Страница 5: ...Gas Type Methane Gas Liquid Gas LPG G20 G30 G31 Lower Wobbe Index at 15 C 1013 mbar MJ m3 34 02 0116 09 88 MJ Kg 45 65 46 34 Rated Feed Pressure mbar mmCA 20 204 30 306 37 377 Consumption m3 h 3 14 Kg...

Страница 6: ...mes into flue duct and emission of air from outside N B To insert a flue bend reduce total length of flue by 0 5 m NOTE USE ORIGINAL RADIANT APPROVED FLUE KIT SYSTEMS FLUE ACCESSORIES AND FLUE DIAPHRA...

Страница 7: ...nal dynamic pressure of 20m Bar 8 in wg at the boiler Installation pipes should be fitted in accordance with BS6891 1988 Pipework that supplies the boiler must be a 22 mm ininterrupted supply from met...

Страница 8: ...onditioning systems If this should occur the appliance MUST BE TURNED OFF IMMEDIATELY and the local gas region consulted Where the lowest part of the terminal is fitted less than 2m 6 6ft above a balc...

Страница 9: ...WALL The installation and fixing to wall of the water heater must conform to the national standards and safety norms Follow these instructions 1 With a spirit level min length 40 cm draw a line on the...

Страница 10: ...ensions on p 5 Check the internal and external seal of the gas feed system If the unit is not used for an extended time close the main gas feed cock Conversion of the unit from Nat Gas to LPG must be...

Страница 11: ...tors must be installed with new gaskets Reassemble the entire burner unit Attention after every disassembly and re assembly of gas connections check carefully with soap and water 3 Move the selector l...

Страница 12: ...ctor back fig 2 to its original position Tighten the aluminium cap of the regulator remove the pressure gauge fig 3 and tighten the B pressure point screw Gas type Natural Gas Liquid gas LPG G20 G30 G...

Страница 13: ...l as follows A Turn off the electrical power supply at the mains B Remove the boiler front casing C Undo the two side screws on the panel using the VT screwdriver and turn it to the position shown in...

Страница 14: ...On off SENSOR INTERRUPTED OFF R 45Kohm ON R 45Kohm On off 0 PWM LINK FOR MINIMUM OUTPUT ADJUSTMENT NO CONTACT OK FAN OVER RUN TIME 8 min P1 0 CHECK PA 0 100 MIN OUTPUT CAP GPL P3 PWM SIGNAL GENERATOR...

Страница 15: ...SENSOR CVI m MODULATION SIGNAL SP PWM BLACK LIMIT THERMOSTAT POWER SWITCH TEMPERATURE SENSOR POWER OM INDICATOR KEY IGNITION ON INDICATOR ST TL IG LT LF N NEUTRAL L LINE ST RED WHITE GREEN BLACK ROTAT...

Страница 16: ...p Shut down requires manual resetting to restore operation wait ten seconds and then push reset button 5 Re ignition is provided if the main burner accidentally shuts down The heater will shut down if...

Страница 17: ..._Line Neutral polarity reversed _Ionisation electrode _Ionisation electrode lead _Electronic ignition board _Reverse polarity _Check and adjust the electrode position _Replace it _Replace it Power in...

Страница 18: ...up B Remove the tape and open the 4 flaps toward the outside C Remove the inside cardboard packing D Hold the water heater from the rear frame when lifting IMPORTANT The packing material cardboard is...

Страница 19: ......

Страница 20: ...1329 828555 All descriptions and illustrations contained in this leaflet have been carefully prepared but we reserve the right to make changes and improvements in our products whitch may affect the ac...

Отзывы: