Installation manual
SYSTEM BOILER
– TA02A101.B1203
9
STARTING UP THE BOILER
Before turning on the boiler read the following warnings carefully .
Make sure that the warranty booklet carries the stamp of the authorised technician responsible for installing the boiler.
Installation, starting up for the first time, adjustments and maintenance operations must all be carried out solely by
qualified technicians. Incorrect installation may cause damage to persons, animals or property for which the
manufacturer cannot be held liable.
WARNING!
Do not start the boiler unless you are sure it has been thoroughly tested by an authorised technician.
If the boiler should freeze up, under no circumstances attempt to turn it on but call the
RADIANT HELP LINE
(01329.828555)
immediately.
LEGEND
(see fig. 1)
1.
ON-OFF SWITCH
2.
BOILER THERMOSTAT KNOB
3.
WARNING: LOCK-OUT INDICATOR
4.
OPERATING/ POWER INDICATOR
TO FILL SYSTEM
Turn ON service valve to vent and feed tank.
Fill system and vent all radiators.
Ensure system is fully filled before starting
boiler.
BOILER IGNITION AND REGULATION
a)
Turn on the gas cock situated under the
boiler
b)
Turn ON/OFF switch to ON position (make sure power light comes on) (see fig. 1)
c)
set the central heating temperature
d)
the automatic ignition system will turn the burner ON
It may be necessary to repeat the procedure a few times to purge air from pipes.
Wait 10 seconds and then, to reset the boiler, turn ON/OFF switch to OFF and then ON to reset and try the ignition
procedure once again.
If locking-out persists, turn boiler OFF and call the RADIANT HELP LINE - 01329.828555.
TURNING OFF THE BOILER
Turn ON/OFF switch to OFF position.
If the boiler will not be used for long periods it is recommended that the gas cock under the boiler be shut off.
TO DRAIN HEATING SYSTEM
Turn OFF service valve to vent and feed tank.
Attach Hose pipe to drain cock at lowest point on system.
Ensure hose is sited into drain, drain system.
WARNINGS
To keep the boiler in efficient and safe operating condition, carefully follow the instructions listed below:
Have normal maintenance performed at least once a year by one of our authorised service centres (a fee will be
charged), combustion tests are necessary every years and should again be carried out by a qualified Radiant
technician (in accordance with D.P.R. 412 regulations, 26-08-93).
Do not clean the casing or internal parts of the boiler with reducing agents or solvents. Clean only with soap and
water.
Never leave flammable materials in the immediate vicinity of the boiler.
Please ensure that the boiler in commissioned in line with all BENCHMARK BOOKLET REQUIREMENTS. Failure to
do this may in validate the guarentee.