MAINTENANCE 

 

To keep the boiler in efficient and safe operating condition, we 

recommend you perform the following checks at least once a 

year:  

• 

Check all seals on the gas side and replace gaskets to 

restore perfect seal as required.  

• 

Check all seals on the water side and replace gaskets to 
restore perfect seal as required.  

• 

Visually check combustion and the combustion chamber; 

dismantle and clean the chamber if necessary.  

• 

Check the primary exchanger and clean it if necessary. 

• 

Check functioning of gas safety systems: Insufficient gas 

safety device (flame detection sensor for electronic ignition 
boilers) thermocouple for pilot light boilers. 

• 

Check functioning of heating safety systems: safety 

thermostat for temperature limit, safety sensor for pressure 

limit. 

• 

Check the exhaust flue safety device 

• 

Check the max. and min. modulation pressures and the 

modulation. 

• 

Check that the electrical connection conforms to the 

description in the instruction manual  for the boiler. 

• 

Check the domestic hot water flow rate and 

temperature. 

 

When dismantling the boiler casing, be careful when 

removing the side panels after having removed the front 

panel; the front panel is removed by undoing the lower 

and front fixing screws and then removing as shown in 

fig.1, lifting it and then pulling it away. The new side 
panels are connected to the frame by means of two 

hooks which correspond with two slots on the frame to 

ensure quick and efficient fixing  

 

UNPACKING 

A.

 Set the packed boiler (fig. 2) down on the floor 

making sure that the arrow is pointing upwards and 

remove the sticking tape. Open the 4 flaps 

outwards. 

B.

 Turn the boiler 180° supporting it by hand. 

C. 

Lift the boiler with the packing pieces positioning it 

vertically in order not to damage the lower corners 

of the casing and remove the packing pieces. Lift 

the boiler by holding it at the back and proceed with 

installation.  

 
N.B.

 It is recommended that the boiler be unpacked before installation. The company cannot be held responsible for any 

damage caused to the boiler due to incorrect handling of the boiler. 

 

IMPORTANT! 

The packing materials (cardboard) are recyclable. 
 

IMPORTANT! 

The inner packing materials (plastic bags, polystyrene foam, nails etc.) are potentially dangerous and must not be left within 

reach of small children. 

2

1

Fig. 2 

A

B

C

Fig. 1 

Содержание RCM

Страница 1: ...Specification RADIANT BRUCIATORI S p A Montelabbate PU ITALY By Technical Department INSTALLATION USE AND MAINTENANCE MANUAL FOR GAS FIRED WALL HUNG BOILERS Model RCM TYPE B OPEN COMBUSTION CHAMBER Mo...

Страница 2: ......

Страница 3: ...MENTS page 6 BOILER INSTALLATION page 8 ELECTRICAL CONNECTIONS page 10 11 20 23 BOILER CONTROL PANEL page 12 STARTING UP THE BOILER FOR THE FIRST TIME page 12 BOILER ADJUSTMENTS page 14 MULTIGAS OPERA...

Страница 4: ...G AN OPTIONAL TIMER SELF DIAGNOSTIC LEGEND see fig 2 6 OPERATING POWER INDICATOR 7 DOMESTIC HOT WATER OPERATION 8 HEATING OPERATION 9 FLASHING LIGHT DENOTING AIR PRESSURE SWITCH FAILURE 10 FLASHING LI...

Страница 5: ...e adjusted from a minimum of 30 C to a maximum of 80 C REGULATING THE HOT WATER TEMPERATURE The hot water temperature is regulated by turning knob 4 see fig 1 pag I turn it counter clockwise to lower...

Страница 6: ...ompact homogeneous highly functional unit that is easy to install and simple to operate The wall mounted boiler is equipped with all of the approved accessories required to make it a true independent...

Страница 7: ...n constructed to heat the home and to produce hot water The constructor declines all responsibility for incorrect installation and or use of the device Do not leave the device on when it is not being...

Страница 8: ...12 8 12 8 17 5 BTU h 43648 43648 59250 Maximum rated output KCal h 20550 20900 23090 Kw 23 9 24 34 26 85 BTU h 81542 82931 91621 Minimum rated output KCal h 9370 9450 12900 Kw 10 9 11 15 BTU h 37180 3...

Страница 9: ...th by 0 8 m Kit B Double exhaust emission twin flue system with 360 rotation It allows the flue exhaust into a flue duct and the air intake directly from an external wall To insert a bend reduce total...

Страница 10: ...e chimney collective flues with natural draft or multiple combined flues follow the directions set out in the UNI 10640 standard CONNECTION OF FLUE PIPES All boilers must be connected to a duct for di...

Страница 11: ...minal dynamic pressure of 20m Bar 8 in wg at the boiler Installation pipes should be fitted in accordance with BS6891 1988 Pipework from the meter to the boiler must be 22mm copper tube The complete i...

Страница 12: ...al air infiltration or forced ventilation air conditioning systems If this should occur the appliance MUST BE TURNED OFF IMMEDIATELY and the local gas region consulted Where the lowest part of the ter...

Страница 13: ...ves as shown in the picture 5 Position the boiler paying attention to hang it to the hanging bracket do not lean the boiler on the JIG and make final connections WATER CONNECTIONS To facilitate instal...

Страница 14: ...ating sensor and 4 C Hot water sensor and protects the boiler down to 2 C external temperature To protect the internal Radiators a room thermostat or remote control must be fitted NOTE The frost syste...

Страница 15: ...follows A Turn off the electrical power supply at the mains B Remove the boiler front casing C Undo the two side screws on the panel using the VT screwdriver and turn it to the position shown in fig...

Страница 16: ...o the entry point on the electrical control box along with all the other leads on the boiler B Move the bridge PT see fig 1 from terminal TA to the free one next to it C Insert the thermostat wires fi...

Страница 17: ...by using a soapy solution and eliminate all eventual leaks The checking procedure for the gas burner attachment is carried out with the boiler working make sure the electrical mains switch is OFF rem...

Страница 18: ...s ON see fig 2 pag 12 The automatic ignition system will turn the burner on It may be necessary to repeat the procedure a few times to purge air from the pipes To repeat the ignition procedure press r...

Страница 19: ...small screwdriver for any adjustments Turn clockwise to increase gas pressure to the burner at start up by setting the trimmer to maximum calibration pressure of modulator see page 16 Turn counter clo...

Страница 20: ...hen converting the boiler to work with a different type of gas remove the existing plate and replace it with the new one supplied in the conversion kit h calibrate the new max and min settings for the...

Страница 21: ...g C Slide out the coil 1 located above the gas valve Fig D Tighten plastic screw 3 by turning it clockwise be careful not to break it Fig E Use a no 17 spanner to undo the lock nut 5 which holds the c...

Страница 22: ...ctor switch to the position required DIVERTER VALVE VC 6012MG6000 The diverter valve is the device which controls the boiler switching from central heating to d h water circuit and vice versa The dive...

Страница 23: ...stic material which has type approval with non toxic characteristics and is unaffected by hard water In addition a filter is fitted before the flowswitch and at the cold water inlet which eliminates a...

Страница 24: ...STAT 14 ELECTRONIC GAS VALVE VK4105 A 1001 15 GAS PRESSURE MODULATOR 16 ELECTRONIC IGNITION BOARD 17 EXPANSION VESSEL 18 3 SPEED CIRCULATION PUMP WITH AIR VENT 19 AUTOMATIC AIR VENT 20 HEATING CIRCUIT...

Страница 25: ...D2 J3 FA1 C3 R48 C20 R49 R17 R23 R24 R47 R13 C8 J9 C6 C19 C21 C7 R15 R32 C13 R39 R37 R31 41 M9 R62 R61 R57 R16 42 C14 C9 R38 C5 RS1 J20 IC2 R18 IC1 R42 43 GPL 44 J7 46 45 R20 C12 R58 C10 C15 R40 R56 M...

Страница 26: ...LB 7 6 9 9 8 11 11 10 10 12 12 8 13 EA ER 14 15 P 6 ELECTRONIC TEMPERATURE INDICATOR 54 50 51 53 52 55 56 58 57 RVB RVA RV 2 1 3 7 23 19 24 17 18 22 IG VD R CY CX L 20 5 21 16 4 NET FILTER CY N THERMO...

Страница 27: ...ED5 C6 C7 RS1 R58 R22 R21 4 2 1 3 15 14 22 LED2 LED1 LED3 LED4 RAVI II R31 42 R18 R17 yellow blue R48 FA1 C20 R49 R23 R24 R47 C19 C21 red brown R39 C9 M9 R62 R61 R57 J16 R38 C5 J20 R37 41 R16 C14 IC2...

Страница 28: ...19 24 18 22 12 13 12 11 EA 8 ER 6 RPA P 15 PTC2 14 5 20 21 V RVA 16 2 1 3 7 4 PA VD NET FILTER IG R CY CY CX N L AIR PRESSURE SWITCH FAN PUMP RELAY CONTACT D H WATER RELAY CONTACT FAN RELAY CONTACT T...

Страница 29: ...erature When dismantling the boiler casing be careful when removing the side panels after having removed the front panel the front panel is removed by undoing the lower and front fixing screws and the...

Страница 30: ...a replace it b re connect or replace it c replace it d change over polarity e make earth connection f fit conversion kit 4 Boiler on temperature rises rapidly and extinguishes flame light 2 fig 1 on...

Страница 31: ...Installation Manual Wall Hung Boiler Cod 99817NA July 2001 26...

Страница 32: ...AIR VENT 12 24028LA CIRCULATING PUMP MOTOR 13 96008LA 3 BAR PRESSURE RELIEF VALVE 1 2 14 59010LA WATER PRESSURE SWITCH 1 8 15 96030LA AUTOMATIC AIR VENT VALVE 5020 3 8 16 95011LA 8 LT EXPANSION TANK W...

Страница 33: ...Tel 39 0721 498822 Fax 39 0721 499815 Email italia radiant it tecnico radiant it export radiant it Internet http www radiant it All descriptions and illustrations contained in this leaflet have been c...

Отзывы: