60
R2K 34 RAIN - RAD - ING - Man.Inst. - 1901.1_V3_firm.L224C_AHS
2 T
rasf
ormazione tipo gas_R2K 34_v
.3_EN
2. MAINTENANCE
SUPPOR
T
C
ENTRE
2.2.18. GAS CONVERSION
ATTENTION
Make sure that the gas adduction tube is
suitable for the new type of fuel with which the boiler
is supplied.
› loosen the two screws ‘1’ (fig.1) from the
fastening bush, and remove the air suction tube;
› unscrew the tube coupling that connects the gas
valve to venturi;
› unscrew the three fastening screws ‘2’ (fig.1) of
the venturi ‘V’ (fig.1) using a 10 key, as shown in
figure 2;
› remove the two screws ‘3’ (fig.3) and apply
pressure on the rear side of venturi ‘C’ (fig.3);
› replace the body venturi with the one suitable for
the type of supply gas (cod. 30-00207 for Natural
gas / cod. 30-00201 for Universal LPG) and make
sure the tooth ‘D’ (fig.3) is adjusted downwards
on the aluminium ring nut (see fig.3);
› remount the components following the
demounting operations in reverse making sure
that gasket ‘G’ is re-assembled as shown in fig.1;
› set the boiler to operate with the new type of gas,
changing the value of the parameter P02 ‘GAS
TYPE SELECTION’ from the control panel (see
chapters ‘DIGITECH CS PARAMETERS TABLE’
and ‘ACCESSING AND PROGRAMMING THE
PARAMETERS’);
› adjust the CO2 combustion value as indicated in
chapter ‘CO2 VALUE CHECK AND CALIBRATION’.
1
2
2
V
2
G
3
3
D
C
C
fig. 1
fig. 2
fig. 3