12
R2K 34 RAIN - RAD - ING - Man.Inst. - 1901.1_V3_firm.L224C_AHS
1 Spazi tecnici minimi e posizionamento_RAIN_EN
1. INSTALLATION
INST
ALLER
To facilitate the installation, the boiler is provided
with a jig that allows setting in advance the
connections to the tubes offering you the possibility
of connecting the boiler to completed masonry
works.
For machine positioning, proceed as follows (see
fig. 3):
1. Trace a line using a spirit level (min. length 25
cm) on the installation wall.
2. place the top of the jig along the traced
line respecting the distances of the water
connections; then mark the two points to insert
the two knobs or the fasteners, then trace the
points for the fume exhaust fittings;
3. remove the jig and drill the wall;
4. hang the device using the knobs or the bracket
and perform the connections.
3
1
4
2
70
80
102
49
31
78
Ø80
Ø125
Ø100
358
26
26
54
54
821
681
699
302
785
fig.3