3
R1K 50 RAIN - RAD - ING - Man.Inst. - 1901.1_SK.3_firm.L224C_AHS
R1K 50 RAIN_Man.Ins
t._AHS_EN
TABLE OF CONTENTS
TABLE OF CONTENTS
INTRODUCTION
5
1. INSTALLER SECTION
7
1.1. INSTALLATION
8
1.1.1. GENERAL INSTALLATION WARNINGS
8
1.1.2. BOILER LOCATION ENVIRONMENTAL REQUIREMENTS
8
1.1.3. REFERENCE LEGISLATION
9
1.1.4. BOILER OVERALL DIMENSIONS
10
1.1.5. JIG
10
1.1.6. CIRCULATOR PREVALENCE/FLOW DIAGRAM
11
1.1.7. CHECK LIST
12
1.1.8. BOILER INSTALLATION
13
1.1.9. HYDRAULIC CONNECTION
15
1.1.10. CHARACTERISTICS OF THE WATER OF THE SYSTEM
16
1.1.11. SYSTEM FILLING
18
1.1.12. CONDENSATE DRAIN
19
1.1.13. ANTI-FREEZE PROTECTION
21
1.1.14. GAS CONNECTION
22
1.1.15. ELECTRICAL CONNECTION
22
1.1.16. POWER SUPPLY
23
1.1.17. OPTIONAL ELECTRICAL CONNECTIONS
24
1.1.18. FUME EXHAUST FITTINGS
26
1.1.19. TYPES OF FUME EXHAUST SYSTEMS
28
2. SUPPORT CENTER SECTION
31
2.1. FIRST START-UP
32
2.1.1. PRELIMINARY OPERATIONS FOR FIRST START-UP
32
2.1.2. BOILER COMMISSIONING
33
2.1.3. CO2 VALUE CHECK AND CALIBRATION
34
2.1.4. ACCESSING AND PROGRAMMING THE PARAMETERS
35
2.1.5. DIGITECH CS PARAMETERS TABLE
37
2.1.6. ELECTRIC FAN FREQUENCY/HEAT CAPACITY DIAGRAM
45
2.2. MAINTENANCE
46
2.2.7. GENERAL MAINTENANCE WARNINGS
46
2.2.8. TECHNICAL DATA
47
2.2.9. TECHNICAL ASSEMBLY
49
2.2.10. HYDRAULIC BOARD
50
2.2.11. WIRING DIAGRAM
51
2.2.12. ACCESSING THE BOILER
52