![Radiant R1K 50 Скачать руководство пользователя страница 12](http://html1.mh-extra.com/html/radiant/r1k-50/r1k-50_installation-and-maintenance-manual_3244151012.webp)
12
R1K 50 RAIN - RAD - ING - Man.Inst. - 1901.1_SK.3_firm.L224C_AHS
1 Check Lis
t_R1K 50 RAIN_SK.2_EN
1. INSTALLATION
INST
ALLER
1.1.7. CHECK LIST
L
N
Se
Se
Ta
Ta
+
+
1.
Ensure Water Pressure 1.2 Bar
“Refer to Pg 18 for more details”
2.
Install room
thermostat
Remove
thermostatic
loop after
commissioning
R1K 50 RAIN Check List
“Refer more
“Refer to Pg 24 for more details”
Gas Valve
Auto Air Vent
Control Panel
“F33”
Will appear when you first turn on the boiler.
This is just a air purge function and will last for
5 mins
. (Please Allow This Cycle To Finish)
“Refer to Pg 33 for more details”
Loosen
to Pg 18 for
details”
to increase %
“Refer to Pg 34 for more details”
Use position 1 to adjust maximum Co2 %
Natural Gas 9.3 - 9.1%
LPG 10.3 - 10.1%
Note: Turn screw anti-clock wise to
increase %
“Refer to Pg 34 for more details”
Use position 2 to adjust minimum Co2 %
Natural Gas 9 - 8.8%
LPG 9.9 - 9.7%
Note: Turn screw clock wise
2
1