9
R1CR 24 - RAD - ING - Manual - 1807.1_SK.2_MIAB3013_R7_PDX
1 Av
ve
rte
nze
gener
ali pe
r l'in
stall
azione
_L
oca
le ca
ldaia
_c
ond
_luogo
pa
rz. prot
_E
N
1. INSTALLATION
INST
ALLER
LOCATION (SEE FIG.2 AT CHAPTER ‘POSITIONING
AND MINIMAL TECHNICAL SPACES’).
THIS BOILER IS ABLE TO OPERATE IN A PARTIALLY
PROTECTED PLACE, WITH SURROUNDING
TEMPERATURES WITHIN A MIN. OF -10 °C AND A
MAX. OF 60 °C.
WARNING
If the temperature in the boiler installation
location goes below -10° centigrades, please fill
the plant with anti-freeze liquid and insert and
electrical resistances kit (see chapter ‘ANTI-FREEZE
PROTECTION’).
WARNING
The manufacturer will not be held
responsible for damages caused by incorrect
installation not in conformity with the over mentioned
instructions and not protected adequately from the
freeze.
1.1.3. REFERENCE LEGISLATION
The installation must be realized according to
the requirements of current legislation and in
compliance with local technical regulations,
according to the indications of the good technique.