25
1300905-W2-A
Details of in-service testing and maintenance
Initial commissioning test data (Supply pressures and temperatures, mixed water temperature,
flow rate, result of cold water isolation test, date carried out, signature of maintenance person).
First in-service test due date
First in-service test data (As for initial commissioning)
Details of any remedial work carried out to valve or supply system
Second in-service test due date
Second in-service test data (As for initial commissioning)
Details of any remedial work, including part replacement, carried out to valve or supply system
Next in-service test due date
Next in-service test data (As for initial commissioning)
Details of any remedial work, including part replacement, carried out to valve or supply system.
Note!
Local requirements may demand that additional information be recorded.
Training
Maintenance personnel should also ensure that the user's staff are aware of the importance of
reporting temperature variations and that when detected, these should be recorded in the log.
Содержание 320
Страница 1: ...1 1300905 W2 A 320...
Страница 3: ...3 1300905 W2 A X 1 q X 1 q X 1 q X 1 q 320 IC X 3 q X 2 q X 1 q X 1 q X 2 q...
Страница 4: ...4 1300905 W2 A 320 IF X 1 q X 1 q X 1 q X 1 q X 2 q X 1 q X 1 q X 2 q...
Страница 5: ...5 1300905 W2 A 320 F X 1 q X 1 q X 1 q X 3 q X 1 q...
Страница 6: ...6 1300905 W2 A 320 M X 1 q X 1 q X 1 q X 3 q X 1 q...
Страница 12: ...12 1300905 W2 A a b 6 0 mm 2 1 3 0 mm 6 0 mm 3 0 mm 6 0 mm...
Страница 13: ...13 1300905 W2 A 3 320 IC 320 IF Install the connections...
Страница 14: ...14 1300905 W2 A 320 M 320 F 4 1 min...
Страница 15: ...15 1300905 W2 A 5 3 0 mm 6 320 IC 320 IF Install the pipework a...
Страница 16: ...16 1300905 W2 A 320 M b c 320 F...
Страница 29: ...29 1300905 W2 A...