background image

Page 2 

Kit Contents

Kit Contents

(1) Cable Management Arm Assembly

(2) Rail Assembly

Cable Arm Brackets:

(1) Long CMA Bracket

Rail Hardware:

(7) 10-32 x .375 Truss Head Screws

(2) 8-32 x .188 Phil Pan Head

(2) 8-32 x .375 Phil Pan Head

Installation Instructions

Step 1. 

Rear Brackets: 

The rear brackets are pre-set for the most common "Mounting Depth 

Range" which is 28.25"-29.5". If this is not correct for your rack, you can remove the nuts 

and reposition the brackets. Which can then cover a "Mounting Depth Range" from 25.25" 

to 31".

Step 2. 

Rail Attachment: 

Slide the innertrack of the rail completely out of the outer rail. You 

do this by pulling up on the saftey latch, then out on the rail. Then remove the front Dell 

shoulder nut, and slide the rail onto the box. Then reattach the Dell shoulder nut which will 
lock the rail in place. Repeat for other side.

"Mounting Depth Range"

Dell 2950

Tabs Point Up

Inner Rail/Shim Assembly

Shoulder Nuts

Rail Release 

Safety Catch 

Отзывы: