Page 2
Kit Contents
Kit Contents
(1) Cable Management Arm Assembly
(2) Rail Assembly
Cable Arm Brackets:
(1) Long CMA Bracket
Rail Hardware:
(7) 10-32 x .375 Truss Head Screws
(2) 8-32 x .188 Phil Pan Head
(2) 8-32 x .375 Phil Pan Head
Installation Instructions
Step 1.
Rear Brackets:
The rear brackets are pre-set for the most common "Mounting Depth
Range" which is 28.25"-29.5". If this is not correct for your rack, you can remove the nuts
and reposition the brackets. Which can then cover a "Mounting Depth Range" from 25.25"
to 31".
Step 2.
Rail Attachment:
Slide the innertrack of the rail completely out of the outer rail. You
do this by pulling up on the saftey latch, then out on the rail. Then remove the front Dell
shoulder nut, and slide the rail onto the box. Then reattach the Dell shoulder nut which will
lock the rail in place. Repeat for other side.
"Mounting Depth Range"
Dell 2950
Tabs Point Up
Inner Rail/Shim Assembly
Shoulder Nuts
Rail Release
Safety Catch