2Post Flush Installation Instructions
Page 7
Equipment Mounting
Lugs (2) on each side
Step 3.
Install the equipment: Slide the equipment onto the rails so the Equipment
Mounting Lugs on each side slide into the Rail Slot on both sides. Slide the
equipment all the way in. Tighten the (2) screws on the back of the left slide rail.
Slide the equipment out about 8 inches and tighten the (2) screws on the front of
the left slide rail.
Note:
When tightening the loose rails, support the bottom of the server to ensure proper
rail adjustment.