Page 6
2Post Flush Installation Instructions
Step 1.
Install Rails:
,QVWDOOLQJWKLVUDLONLWLQD3RVWÀXVKUDFNUHTXLUHVDFKDQJHWRWKH
SUHDVVHPEOHGUDLOFRQ¿JXUDWLRQDVIROORZV5HYHUVHWKHUHDUVOLGHUVRWKDWWKH
ÀDQJHLVWRZDUGWKHIURQW1RWHWKLVZLOOUHTXLUHD´ZUHQFKRUUDWFKHW
Rack Mount
Flanges
Range 3" to 6"
[76mm to 152mm]
Step 2.
Attach the rails to the rack:
- Attach the Front and Rear of the rails to the 2Post rack using (4) supplied Pan
Head Screws on each side.
- Tighten the front and rear Pan Head Screws on the right side rail. Leave the
front and rear Pan Head Screws on the left side rail slightly loose.
Front Left
Front and
Rear Right
(4) 8-32 Pan Head Screws
(4) 10-32 or 12-24
Pan Head Screws
Hook
Plate
Hook Plate
Pre-Set Range 15.00" to 19.75"
[381mm to 501mm]