background image

 
STEP 3: ATTACH FIRST ARM 

TIP! It is easiest to attach arms when the corner of the pot rack to which you are connecting the arm hangs slightly past the edge of the table. 
That provides clearance for the flared end that extends below the body of the rack.

  

Now remove the barrel bolt (28A) from one of the corners, 

keeping barrel nut (28B) in position.  Place a curve arm (22) (2-hole end) on the OUTSIDE of the body. Align the three pieces: (side bar 3A) 
on inside, bookshelf end piece (9) in middle, arm (22) on outside), and reinsert the barrel bolt (28A)  through the upper hole from the OUT-
SIDE.  Repeat for lower hole.  Do not tighten barrel bolts firmly until all bolts are in place. 

 

STEP 4: ATTACH OTHER ARM 

Repeat STEP THREE  for remaining arm.

 

 

STEP 5: LEVEL POT RACK ON TABLE 

Place assembled rack squarely on table and adjust all parts to be certain they are level and straight.  Then tighten all bolts firmly. Remember 
~ the back bar (3D) is not attached until the rack is installed on the wall.   

 
STEP 6 ASSEMBLE ACCESSORY SHELF 

Note the small holes located in the center of the flat section of each shelf bracket.  Two set screws (18E) will be driven through 
them to secure the Wood shelf to the brackets. 
 
Center the Wood shelf on top of the brackets (now fixed in position) then with a pencil mark the two set screw points on the un-
der side of the bracket.  Pre-drill the marks (or tap a starter hole with a hammer and a small nail) then drive set screws (18E) 
into Wood to secure shelf. 

 

STEP 7:  MEASURE FOR WALL 

After the shelf is assembled, and after the bookshelf rack is squared and tightened, the distance from the center of the holes at top of the 
arms to the center of upper holes in back bar should be 9 3/4”.  The width between upper holes is 20-3/4”.  (see diagram A at bottom of Tog-
gler Instructions on page 4).  Use these measurements when determining location of rack on the wall in the installation section below. 

 

NOTE:  

Grid and grid brackets will be added AFTER the rack and accessory shelf are  attached to the wall. 

 

How to Attach Your Pot Rack to your Wall 

TOOLS NEEDED FOR INSTALLATION: 

Provided:  Installation hardware (anchors, bolts, wall screws and red sleeves) 
You will need: level, tape measure, pencil, electric drill and ½”  and 1/8” drill bits, hammer and nail. 
 

STEP 1: LOCATION 

Decide where you want to place your pot rack.  Consider the height of the wall where the pot rack will hang, keeping in mind how far below 
the rack your pots and utensils will hang, plus how high above your head you can still easily reach cookbooks, etc. stored on the grid.    
 
On the wall, mark the four points 20-3/4” long by 9-3/4”  high where the top of rack arms and back bar will attach.  Then tap a small nail 
through each mark to be certain a joist is not in the way.  NOTE: because your pot rack includes toggle anchors, you DO NOT need to locate 
and bolt to studs.  See more information under STEP 2 below. 
 

STEP 2: INSTALL TOGGLER DRYWALL ANCHORS 

RACK IT UP!’s

 drywall togglers eliminate the need to bolt your pot rack to a stud. The steel anchors are very strong and when installed in dry-

wall each drywall anchor holds about 200 lbs. Two anchors hold about 400 lbs.  Install the two Toggler drywall anchors (27A) where the two 
holes in the tops of the two bookshelf arms are located.  Carefully follow Steps 1 through 4 of the Toggler Drywall Anchor instructions found 
on the back of this booklet.  Do not mount the bookshelf rack at this time.

 

 

INSTALL IN WOOD? 

 

If you need to install one or both sides of your rack in wood, use as many of the four wall screws (30A) included, but without a red 

 

sleeve.  See back page of this booklet under Step 1. 

 

STEP 3:  INSTALL LOWER RED SLEEVE ANCHORS 

Follow steps 5) and 6) of the drywall anchor instructions on the back of this booklet.  The bookshelf rack is not attached to your wall, but inse-
curely.  Please hold the rack in place. 
   

STEP 4:  COMPLETE RACK ATTACHMENT AT TOP OF ARMS 

Holding the Accessory Shelf between the bookshelf arms and the wall, line up the upper shelf bracket (35) holes with the upper holes in the 
bookshelf arms (22).  Attach the bookshelf arms and accessory shelf  brackets to your wall by carefully following Step 7) of the drywall anchor 
instructions on the back of this booklet. 

 

STEP 5:  Grid and Brackets 

Place the narrow end of the three grid brackets (7B) to the back of the bookshelf body and place the grid over the brackets. 
 

 

CLEANING:  

Your pot rack has a durable powder coat finish designed to provide years of protection. Cleaning is done easily using soap and 
a damp cloth.  Dry thoroughly after cleaning.

   

Содержание MPE 15

Страница 1: ...o be free of material defects for a period of one year from the date of purchase Your exclusive remedy is the repair or replacement of the defective product and shall be subject to the following conditions 1 You send a notice of any defect to RACK IT UP within the warranty period and 2 You return the defective product to RACK IT UP 24 Colwell Street Port Hadlock WA 98339 postage prepaid within 20 ...

Страница 2: ...e powder coat finish applied at the factory also adheres to the inside of bolt holes pushing a bolt through it during assembly may be difficult Therefore before connecting parts we recommend that you check to see that bolts slip easily through all holes If they do not carefully clear paint from holes in side bars ends and arms using a small knife SECOND be certain that barrel nuts and bolts screw ...

Страница 3: ...need level tape measure pencil electric drill and and 1 8 drill bits hammer and nail STEP 1 LOCATION Decide where you want to place your pot rack Consider the height of the wall where the pot rack will hang keeping in mind how far below the rack your pots and utensils will hang plus how high above your head you can still easily reach cookbooks etc stored on the grid On the wall mark the four point...

Страница 4: ...th drywall surface 3 Bend straps at wall by pushing side to side snapping off straps level with flange of cap 4 Repeat for other anchor point at top of rack arm 5 Install the LOWER red sleeve anchors Using an electric drill with 5 16 bit drill a hole at each of the LOWER marks With your ham mer gently tap a red wall screw sleeve 30B into each hole until it is flush with the drywall surface 6 At th...

Отзывы: