background image

Step 3:

Add Lower Extender Arm Brackets

● 2 x 4-Hole 90° Corner Brackets
● 4 x 16mm Standard Bolts
● 4 x Standard Spring T-Nuts

Both need to be level with each other.

Use a tape measure to ensure they are at the same

height. You will fine tune the height for your monitors in a later step.

Page 8

PRO Series - TRIPLE Monitor Mount Manual (v.04/2021.1)

Содержание PRO TRIPLE

Страница 1: ...Series TRIPLE Monitor Mount Manual v 04 2021 1 If you need any assistance building please let us know We are here to help Team RacingCockpits com 1 833 RACING2 2021 Racing Cockpits Operating Company...

Страница 2: ...RCP Cockpit PRO Parts Guide Vesa Mounts Pivot Plates Right Hand Left Hand 2 Slot Profile 4 Hole Joiner Bracket Page 2 PRO Series TRIPLE Monitor Mount Manual v 04 2021 1...

Страница 3: ...RCP Cockpit PRO Parts Guide Cont 4 Hole 90 Corner Bracket 2 Hole End Cap Standard Spring T Nut 16mm Standard Bolt 12mm SHORT Bolt Page 3 PRO Series TRIPLE Monitor Mount Manual v 04 2021 1...

Страница 4: ...the side Method 2 Push T Nut into T Slot at an angle then snap into place so it ends up flat You can lever the allen wrench in the screw hole to help with this This method is what you will use once th...

Страница 5: ...If you are installing vertically and need to hold the T Nut in place you can put the long end of the allen wrench into the T Slot channel to hold it from below while hand tightening the bolt to secur...

Страница 6: ...Slot Profiles Hardware 2 x 4 hole 90 Joiner Brackets 8 x 16mm Standard Bolts 8 x Standard Spring T Nuts Connect 19 monitor uprights to the back of cockpit uprights TIGHTEN well These will hold a lot o...

Страница 7: ...Step 2 Add End Caps Hardware 2 x 2 Hole End Caps Page 7 PRO Series TRIPLE Monitor Mount Manual v 04 2021 1...

Страница 8: ...4 x 16mm Standard Bolts 4 x Standard Spring T Nuts Both need to be level with each other Use a tape measure to ensure they are at the same height You will fine tune the height for your monitors in a...

Страница 9: ...dard Bolts 4 x Standard Spring T Nuts Both need to be even front to back with each other Use a tape measure to ensure they are mounted at the same distance You will fine tune the distance to your moni...

Страница 10: ...Step 5 Add Upper Extender Arm Brackets 2 x 4 Hole 90 Corner Brackets 8 x 16mm Standard Bolts 8 x Standard Spring T Nuts Page 10 PRO Series TRIPLE Monitor Mount Manual v 04 2021 1...

Страница 11: ...4 Hole 90 Corner Brackets 8 x 16mm Standard Bolts 8 x Standard Spring T Nuts Horizontal rail needs to be centered Use a tape measure to ensure the connections to the extender rails on each are the sa...

Страница 12: ...a Mounting screws Tighten Vesa mount so screws are in the middle of the vertical adjustment channels and not too tight This will allow for fine tuning up down rotate right left Use either Vesa 75 inne...

Страница 13: ...h tape measure 2 Tilt monitor angle back and forward which slides 12mm SHORT bolt in Vesa Mount top channel Move until monitor is level Check this using a level app on most smartphones To lock monitor...

Страница 14: ...things and be sure to re tighten everything well once you re done with each step Pro Tip Viewing distance should be set as close as possible Ideally be just behind the steering wheel for best FOV fie...

Страница 15: ...t Height Distance Cont Adjust Viewing Height Up Down Slightly loosen horizontal bolts highlighted in blue Remember to tighten everything once you re done Page 15 PRO Series TRIPLE Monitor Mount Manual...

Страница 16: ...12mm SHORT Bolts 8 x Standard Spring T Nuts Install top pivot plates with print and bottom pivot plates no print Leave bolts slightly loose so you can slide them back and forth Mount them at the ends...

Страница 17: ...s You may need to slide the top and or bottom slightly to get it all lined up This is normal To pivot arms Keep center bolts tight just slightly loosen end bolts top bottom in the angle adjustment cha...

Страница 18: ...Step 12 Add End Caps Hardware 4 x 2 Hole End Caps Install 2 Hole End Caps on ends of horizontal rail and side arms Page 18 PRO Series TRIPLE Monitor Mount Manual v 04 2021 1...

Страница 19: ...Vesa Mounting screws Tighten Vesa mounts so screws are in the middle of the vertical adjustment channels and not too tight This will allow for fine tuning up down rotate right left Use either Vesa 75...

Страница 20: ...lt monitor angle back and forward which slides 12mm SHORT bolt in Vesa Mount top channel Move until monitor is level Check this using a level app on most smartphones To lock monitor angle adjustment i...

Страница 21: ...ng side arm rail by slightly loosening top bolts 2 Slide the entire arm assembly pivot plates arm monitor together along the horizontal rail by slightly loosening pivot plate bolts on horizontal rail...

Страница 22: ...up or down Then re tighten screws 2 Rotate monitors in Vesa mount vertical channels Slightly loosen bottom vesa screws use slight force and rotation movements Then re tighten bottom screws 3 Adjust mo...

Страница 23: ...Step 16 Fine Tune Monitor Alignments Cont 3 Adjust monitor tilt angle forward back with Vesa mount top channels Page 23 PRO Series TRIPLE Monitor Mount Manual v 04 2021 1...

Страница 24: ...thing to suit your needs and preferences After a few days of use go back around and tighten up all screws bolts to keep everything nice and rigid after it settles in If you need anything please let us...

Отзывы: