![Racine Railroad Products 910103 Скачать руководство пользователя страница 11](http://html1.mh-extra.com/html/racine-railroad-products/910103/910103_operating-and-maintenance-manual_3061731011.webp)
910103
Hydraulic Rail Profile Grinder
Phone: (262) 637-9681
Email:
9.2023 Rev 2.4
Original Instructions
Page
11
of
21
Section 3: Tool Operation
Personal Protective Equipment
Before operating this machine, make sure that all general safety precautions are observed,
and that proper personal protective clothing is worn as described below.
At a minimum, operators should wear the following Personal Protective Equipment:
1. Safety Glasses
2. Hearing Protection
3. Hard Hat
4. High Visibility Safety Vest
5. Leather Work Gloves
6. Steel Toed Safety Shoes
Cup Stone Installation
Inspect the stone before installation.
Use blotters between the stone and backups. The blotters should be made from highly compressible
material and should not be more than .025 inches thick.
Check that the backup is pressed all the way on the spindle shaft. NOTE: The square on the spindle
should slide into the square in the back of the backup.
Turn the spindle end until the backup contacts the stone.
Cup Stone Removal
1. Disconnect the hoses from the tool.
2. Align the hole in the frame with the hole in the motor spacer. Insert the stone locking pin though the
holes in the motor spacer.
If the pin does not slide through the holes easily, adjust stone housing until it does.
3. Open the door on the frame to expose the stone. Hold the stone by hand counter-clockwise (left) until
the pin locks the shaft.
Place the stone removal strap around the stone with the ratchet receiver end in the door opening.
4. Loosen the stone. Once the stone is loosened it can be turned by hand and removed.
5. After the stone has been removed return the stone locking pin to its storage hole and check that the
door is securely fastened.