background image

THE WORKSTATION.  IF YOUR WORKSTATION HAS CASTERS, TURN THE BOLTS AT THE TOP OF THE CASTERS CLOCK-

LH COLUMN

PAGE 2 OF 3

WISE TO LEVEL THE WORKSTATION.

STEP 7:  

ALIGN THE HOLES IN THE HAND SWITCH  

9

  WITH THE PILOT HOLES AT THE BOTTOM FRONT EDGE OF THE

WORKSURFACE  

1

  .  ATTACH THE SWITCH WITH (2) RECEX DRIVE SCREWS  

10

  .

STEP 8:  

ALIGN THE HOLES IN THE CONTROL BOX  

14

  WITH THE PILOT HOLES NEAR THE BACK CENTER OF THE 

WORKSURFACE  

1

  .  ATTACH THE CONTROL BOX WITH (2) RECEX DRIVE SCREWS  

10

  .

STEP 9:  

ATTACH (3) WIRE MANAGEMENT J'S  

11

  TO THE BOTTOM OF THE WORKSURFACE  

1

  WITH (3) WOOD

SCREWS  

8

  .  (NO PILOT HOLES ARE PROVIDED.)  ON 60" AND 72" WORKSTATIONS THE (2) WIRE MANAGEMENT J'S 

NEAR THE CONTROL BOX  

14

  ARE REPLACED BY A METAL U-CHANNEL 

12

  .

STEP 10:  

RUN THE WIRES THROUGH THE WIRE MANAGEMENT J'S  

11

  AS SHOWN ON THE WIRE RUNS DIAGRAM

BELOW.  WHEN THE WORKSTATION INCLUDES A U-CHANNEL, RUN THE WIRES THROUGH IT INSTEAD OF THE (2) WIRE
MANAGEMENT J'S.  PLUG THE WIRES INTO THE CONTROL BOX  

14

  AS SHOWN ON THE WIRING DIAGRAM BELOW.  

WITH THE HELP OF AN ASSISTANT, STAND THE WORKSTATION UPRIGHT IN ITS FINAL LOCATION.  LEVEL THE WORK-
STATION IF REQUIRED BY TURNING THE LEVELING GLIDES CLOCKWISE (FROM THE TOP) ON THE LOW CORNERS OF 

WIRING DIAGRAM

6703 ZINSER ST., SCHOFIELD, WI 54476

PHONE: 800.298.4351 FAX: 866.882.9475

www.raproducts.com

VERSION DATED:  9/8/11

K&A MANUFACTURING

10

LEVELING GLIDE 
OR CASTER

11

14

SHOWN ON THESE VIEWS SO THE

NOTE:  CROSS SUPPORT IS NOT

SWITCH

FRONT

1

STEPS 7-9

10

OTHER COMPONENTS ARE VISIBLE.

8

9

STEP 10

WIRE RUNS

60" & 72" WORKSTATIONS.

RH COLUMN

RIGHT COLUMN WIRE

LEFT COLUMN WIRE

    METAL U-CHANNEL  

12

  

REPLACES THESE (2) WIRE 
MANAGEMENT J'S ON 

HAND SWITCH WIRE

A

M1

M2

HS

END OF CONTROL BOX

Отзывы: