THE WORKSTATION. IF YOUR WORKSTATION HAS CASTERS, TURN THE BOLTS AT THE TOP OF THE CASTERS CLOCK-
LH COLUMN
PAGE 2 OF 3
WISE TO LEVEL THE WORKSTATION.
STEP 7:
ALIGN THE HOLES IN THE HAND SWITCH
9
WITH THE PILOT HOLES AT THE BOTTOM FRONT EDGE OF THE
WORKSURFACE
1
. ATTACH THE SWITCH WITH (2) RECEX DRIVE SCREWS
10
.
STEP 8:
ALIGN THE HOLES IN THE CONTROL BOX
14
WITH THE PILOT HOLES NEAR THE BACK CENTER OF THE
WORKSURFACE
1
. ATTACH THE CONTROL BOX WITH (2) RECEX DRIVE SCREWS
10
.
STEP 9:
ATTACH (3) WIRE MANAGEMENT J'S
11
TO THE BOTTOM OF THE WORKSURFACE
1
WITH (3) WOOD
SCREWS
8
. (NO PILOT HOLES ARE PROVIDED.) ON 60" AND 72" WORKSTATIONS THE (2) WIRE MANAGEMENT J'S
NEAR THE CONTROL BOX
14
ARE REPLACED BY A METAL U-CHANNEL
12
.
STEP 10:
RUN THE WIRES THROUGH THE WIRE MANAGEMENT J'S
11
AS SHOWN ON THE WIRE RUNS DIAGRAM
BELOW. WHEN THE WORKSTATION INCLUDES A U-CHANNEL, RUN THE WIRES THROUGH IT INSTEAD OF THE (2) WIRE
MANAGEMENT J'S. PLUG THE WIRES INTO THE CONTROL BOX
14
AS SHOWN ON THE WIRING DIAGRAM BELOW.
WITH THE HELP OF AN ASSISTANT, STAND THE WORKSTATION UPRIGHT IN ITS FINAL LOCATION. LEVEL THE WORK-
STATION IF REQUIRED BY TURNING THE LEVELING GLIDES CLOCKWISE (FROM THE TOP) ON THE LOW CORNERS OF
WIRING DIAGRAM
6703 ZINSER ST., SCHOFIELD, WI 54476
PHONE: 800.298.4351 FAX: 866.882.9475
www.raproducts.com
VERSION DATED: 9/8/11
K&A MANUFACTURING
10
LEVELING GLIDE
OR CASTER
11
14
SHOWN ON THESE VIEWS SO THE
NOTE: CROSS SUPPORT IS NOT
SWITCH
FRONT
1
STEPS 7-9
10
OTHER COMPONENTS ARE VISIBLE.
8
9
STEP 10
WIRE RUNS
60" & 72" WORKSTATIONS.
RH COLUMN
RIGHT COLUMN WIRE
LEFT COLUMN WIRE
METAL U-CHANNEL
12
REPLACES THESE (2) WIRE
MANAGEMENT J'S ON
HAND SWITCH WIRE
A
M1
M2
HS
END OF CONTROL BOX