Installation Checklist
Before you begin installing the system, you must prepare the site as described in the
Site Planning Guide
and learn of any late-breaking information in the
Release Notes
for your system.
Table 1-8 outlines the steps required to install and initially configure the system. To
ensure a successful installation, perform the tasks in the order they are presented.
Table 1-8
Installation Checklist
Step
Installation Task
Where to Find Procedure
1.
Unpack the enclosure box and check its contents.
“Unpacking an Enclosure and Verifying
its Contents” on page 25
2.
Unpack the rackmounting kit and check its contents.
“Unpacking Rackmount Kits” on page 26
3.
Prepare the rack for installation.
“Preparing the Rack” on page 27
4.
Install the controller enclosure and optional drive
enclosures in the rack.
“Installing Enclosures in a Rack” on
page 27
5.
Connect the enclosures.
“Connecting Controller and Drive
Enclosures” on page 33
6.
Connect the power cords.
“Connecting AC Power” on page 37
7.
Test the enclosure connections.
“Testing the Enclosure Connections” on
page 41
8.
Install required host software and drivers, including:
• HBA drivers
• R/Evolution MPIO DSM
• R/Evolution SES Driver
“Host System Requirements” on page 43
9.
Connect the data hosts.
10.
Connect the management host.
“Connecting Remote Management
Hosts” on page 53
11.
Perform initial configuration tasks:
• Set management port IP properties on the
controller enclosure
• Set the date and time on the controller enclosure
• Configure host ports on the controller enclosure
• Create virtual disks and map volumes
• Test the configuration
Содержание R/Evolution 2730
Страница 1: ...2730 Getting Started Guide P N 83 00004284 12 Revision A January 2009 ...
Страница 6: ...6 R Evolution 2730 Getting Started Guide January 2009 ...
Страница 54: ...54 R Evolution 2730 Getting Started Guide January 2009 ...
Страница 70: ...70 R Evolution 2730 Getting Started Guide January 2009 ...