reinstalled
from the
inside corner of the
firebox.
IF
FIREPLACE IS
ALREADY
INSTALLED,
SIMPLY CUT
SCREWS WITH A
ROTARY TOOL
6.
Place
Heat Shield
into outside fireplace
opening. Fasten with
[Qty 13] 1/2” DT Hex
Screws. Set Stand-
off into position.
7.
Install
Inner Liner
Panel
inside firebox
and secure with [Qty
3] DT Screws
8.
Install
Front Side
Cover
when
installing Glass Front
Door. Refer to
Door
Installation
Instructions.
9.
Reinstall Lower Front
Panel Assembly.
Discard the [2] Outer
Glass Supports as
they are not required.
NOTE:
VLBCK48 Corner Kit
Requires The Same
Framing And
Clearances As
MQVL48 Single Side.
4
Use [Qty 7] DT
Screws to attach
Back, Top, and
Bottom of
Heat
Shield
Install
Inner Liner Panel
and
secure with [Qty 3] DT Screws
Glass Side
Corner Kit side
has the same
Installation
Clearances as
MQVL48
Single Side.
Apply Mill-Pac
to Gasket
Slide Firebox Cover Into Place From Front
IF USING
PORCELAIN OR
FLUTED LINERS:
Remove [Qty 4]
DT Screws from
outside and
install inside
firebox.
IF FIREPLACE IS
ALREADY
INSTALLED,
SIMPLY CUT
SCREWS WITH A
ROTARY TOOL.
3
3
Use [Qty 6]
Pan Head
Screws to
attach Front
of
Heat
Shield
1
1
30
Содержание Kingsman Marquis MQVL48N
Страница 55: ...Gas Conversion for Modulator PART C 55...
Страница 67: ...Proflame 2 Remote Control 67...
Страница 69: ...69...