STEP TWO: ASSEMBLE TOP
STEP THREE: ASSEMBLE PLATFORM AND SET AT DESIRED HEIGHT
NOTES:
The slot at the bottom front
AND
the front space between the fireplace and the AVP both have
the required minimum
84
square inches of opening. Either one may be used.
The side openings have 20-1/4 square inches of opening each. They can be closed in if the
required minimum
84
square inches of opening has been achieved.
If you wish to cover the AVP down to the floor on the sides, install a layer of 5/8” drywall down to
the Tile Lip. This will allow for the installation of the final finishing materials down to the floor.
2.
Assemble Top
using
supplied screws.
3. Set Platform at desired
height and fix with screws.
4. Hook back of fireplace into back of
Platform and attach front with screws.
X10
X12
X4
5. Attach platform to floor
and fireplace to framing.
REAR BRACE
INNER
SIDE
PANEL
INNER
SIDE
PANEL
OUTER
FRONT
PANEL
INNER SIDE
PANEL
OUTER SIDE
PANEL
OUTER
FRONT
PANEL
FRONT
OUTER
PANEL
INNER
SIDE
PANEL
INNER
SIDE
PANEL
INNER
SIDE
PANEL
OUTER
SIDE
PANEL
INNER
SIDE
PANEL
INNER SIDE
PANEL GOES TO
INSIDE
OUTER FRONT
PANEL GOES TO
OUTSIDE
TILE LIP
TILE LIP
TILE LIP
TILE LIP
13
Содержание Kingsman Marquis MQVL48N
Страница 55: ...Gas Conversion for Modulator PART C 55...
Страница 67: ...Proflame 2 Remote Control 67...
Страница 69: ...69...