
®
R&M Materials Handling, Inc
STAGEMAKER
®
COMPACT Concert Hoist
Springfield, Ohio USA
SM10 Installation & Maintenance Manual
: 800 955-9967
web:
www.rmhoist.com
June 2006
5 June 2006 36 SM10-M & I MANUAL - 2006 - 0.doc.
6.6.3
Hoist Motor Brake Adjustment
Figure 6.4
If the maximum air gap
(item “X”, figure 6.4)
of the motor brake has been reached or will be exceeded
before next inspection, readjust air gap.
Minimum air gap Maximum
air
gap
X = 0.008” [ 0.2 mm ]
X = 0.020” [ 0.5 mm ]
Before adjusting brake, remove load. Per ANSI Z244.1, lockout and tag main disconnect switch in de-
energized position. Follow other maintenance procedures outlined in this manual and ASME B30.16.
CONFIGURATION
A
B
C
D
E
SLIP CLUTCH
SETTING AS:
% RATED CAPACITY
125%
125%
125%
250%
125%
11
AIR GAP – “X”