User Manual
January 2005
www.quintet.ie
Page 6
3
Testing
NOTE:
Refer to the diagram below during the test sequences.
Power supply check sequence
1. Connect the DC Power supply provided to the Power input at the back of the
Quintet.
2. Confirm that the Mains Power light is on.
3. If the battery needs to be recharged the Charging light will also come on.
Power On check sequence
1. Turn the Volume control clockwise to the 12 o’clock position.
2. Confirm that the green ‘Ready’ light flashes and after a moment comes on
steady.
3. Press any of the player switches (1-5) and confirm that music can be heard.
Power Off sequence
1. Turn the Volume control fully anti-clockwise to the OFF position.
2. Confirm that the green ‘Ready’ light extinguishes.
3. The Mains Power light will remain on as long as the external power supply is
connected. The Charging light will remain on until the internal batteries are re-
charged.
Ready
light
Mains
Power Light
Charging
Light
Player 1-5
switches
Volume &
On/Off pot