Section IV - Operating Procedures
Place the program cartridge into the
2.
socket and restore power.
The PLC run status lights will be yellow
3.
for a second or two, then turn green.
That signifi es that the program has been
copied.
Power down and remove the program
4.
cartridge, and replace the cover blank.
NOTE: This operation will clear any
5.
internal logs, times and confi gurations
and set them to default settings.
If the cartridge is not removed, the
6.
program will reload every time the power
is cycled, and over-write all settings.
eMail Module for QSIi
Connect to L+ (24 Vdc)
Connect to M (DC Common)
Ethernet Cable
connects here.
Connect to S7
controller.
29
Содержание QGV-20
Страница 2: ......
Страница 70: ...Appendix A Dimensional Drawings QSI 90 120 140 micro 66...
Страница 71: ...Appendix A Dimensional Drawings QSI 90 120 140 micro dry 67...
Страница 72: ...Appendix A Dimensional Drawings QSI 90 120 140 micro tank mounted 68...
Страница 73: ...Appendix A Dimensional Drawings QSI 90 120 140 micro dry tank mounted 69...
Страница 74: ...Appendix A Dimensional Drawings QSI 90 120 140 guage 70...
Страница 75: ...Appendix A Dimensional Drawings QSI 90 120 140 guage dry 71...
Страница 76: ...Appendix A Dimensional Drawings QSI 90 120 140 guage tank mounted 72...
Страница 77: ...Appendix A Dimensional Drawings QSI 90 120 140 guage dry tank mounted 73...
Страница 78: ...Appendix A Dimensional Drawings QGV 20 25 30 460V 74...
Страница 79: ...Appendix A Dimensional Drawings QGV 20 25 30 460V dry 75...
Страница 80: ...Appendix A Dimensional Drawings QGV 20 25 30 460V tank mounted 76...
Страница 81: ...Appendix A Dimensional Drawings QGV 20 25 30 460V dry tank mounted 77...
Страница 91: ......