Page 18
Run the cable along the
carriage with the power
cable to the control
box and plug into the
robotics port on the
PCB.
Use the provided
anchors and zip-ties
to secure the cables to
the carriage. Make sure
they are out of the way
of any moving parts.
2
*Image not representative of all
machine types.
Содержание BUTLER
Страница 1: ...Nolting Metal Frame Assembly Instructions Revision 10 24 2016...
Страница 24: ...Page 24 Intentionally left Blank...
Страница 26: ......
Страница 27: ...Still need help Visit support quiltez com for tutorial videos and additional help documentation...