10 – To release the opening and operate the leaves manually insert the release key as 
shown in     the Fig. 6   

      

 

 
 
 
 
 
 
 

 
 

 

 

 

                                                           Fig. 6

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Содержание QK-H300

Страница 1: ...QK H300 QK H400 HYDRO HYDRAULIC SWING GATE OPENER USER INSTALLATION MANUAL ENGLISH ...

Страница 2: ...POWER SUPPLY 230VAC 50 Hz CURRENT ABSORBED A 1 6 POWER ABSORBED W 300 INCORPORATED CAPACITOR mF 10 PROTECTION LEVEL IP 55 OPENING TIME sec 19 TRAVEL mm 280 380 MAX THRUST N 9400 OPERATING TEMPERATURE Min Max C 30 70 THERMAL PROTECTION C 120 WORK CYCLE 80 ACTUATOR WEIGHT Kg 9 10 ...

Страница 3: ...u to install an outdoor switch in compliance with European standards on the issue of safety to turn the electricity off when servicing the gate Check that each single installed device is efficient and effective Affix easily readable signs warning about the presence of a motorised gate USE It is absolutely forbidden to use the device for any other purposes Installed control board which must have bu...

Страница 4: ...h Nut 3 Bolt M12 x 55 with Nut 4 Bracket to be weld to the leaf length 65 mm 5 Bushing 6 Cylinder cover 7 Manifold 8 Tie rod cover 9 Cup 10 Release valve for emergency manual operating 11 Fastening covers screws 12 Breather screw 13 Release valve key 14 By pass valve adjusting the piston thrust ...

Страница 5: ...se and remove the two screws 11 fig 1 that fastens the tie rod cover to the cylinder Assemble the wall brackets 1 to cylinder bracket by means of the bolt and nut 2 the leaf bracket 4 to cylinder rod by means of the bushing 5 and bolt nut 3 3 Preassemble the cylinder to the gate according to the fig 3 and table 1 ...

Страница 6: ... 120 120 Table 1 4 Temporary fix the actuator to the wall and to the leaf tack weld and turn the leaf gate from the close position up to the max open position normally 95 and check that the leaf turn freely in the hinges and without any swing during its movement 5 Provide to complete the assembly of the actuator to the wall and to gate leaf 6 Connect to the power supply cable 4x1 5 sqmm 7 Proceed ...

Страница 7: ...ylinder are regulated by adjusting two by pass valves The blue valve adjusts the opening pressure The red valve the closing pressure increase the actuator thrust decrease the actuator thrust 8 After installation take away the breather screw from the actuator Fig 5 Fig 5 ...

Страница 8: ...10 To release the opening and operate the leaves manually insert the release key as shown in the Fig 6 Fig 6 ...

Страница 9: ...resence of a person is a risk to his her health and safety Exposed Person any person located entirely or partially in a danger zone A Impact B Crushing C Insulation D Conveyance E Cutting F Slicing The installation must take a close risk examination to prevent crushing conveying cutting grappling trapping so to guarantee a safe installation for persons animal and objects Refer to the law applicabl...

Страница 10: ...irective 93 68 CE 72 23 CE 92 31 CE and also declares that the related and or specific national technical regulations have been followed EN 12453 EN 12445 on Industrial Commercial and Residential Gates and Doors Safe Use of Motorized Doors Requirements and Classification Test Methods EN 12604 EN 12605 on Industrial Commercial and Residential Gates and Doors Mechanical Aspects Requirements and Clas...

Страница 11: ...QK H400 QK H400BC are in compliance with the essential safety requirements of the regulations Regulation 89 392CE on Machinery and its subsequent amendments EMC Regulation 89 336 CE Legislative Decree 615 96 BT Regulation 73 23 CE e 93 68 CE Legislative Decree 626 96 CE Machinery Directive 98 37 and directive 93 68 CE 72 23 CE 92 31 CE and their amendments and modifications and with the regulation...

Страница 12: ...Borinato F lli Snc Via Seccalegno 19 36040 Sossano Vi Italy Tel 39 0444 785513 Fax 39 0444 782371 INFO QUIKO BIZ www quiko biz ...