Pool assembly / frame layout
7
Step 1:
Locate the area most suited for setting up the pool. Clear it of any sharp objects or debris and level it to
zero as explained on the “Preparing the ground” page. If the pool is assembled on unleveled ground, it
may suffer permanent structural warping or damage the liner.
Step 2:
Remove the liner from the box marked “liner” and place it at the center of the area where you plan to
assemble the pool. Take care not to damage the liner when opening the box.
DO NOT USE SHARP
OBJECTS TO OPEN THE BOX THAT CONTAINS THE LINER.
Step 3:
Unfold the liner. Locate the place where the pump and filter system will be connected and position the 2
circular openings on the side where you intend on placing the pump and filter.
Step 4:
Remove the upper frame (parts a,
b, c, d,
e, f, and g) from the box marked “frame”. At this point you will
not need any “U tubes” (part h) or “U tube connectors” (part i). Lay all of the upper frame out in the order
indicated below. Each frame piece will be clearly marked with the corresponding letter.
A
G
G
G
G
C
C
B
B
B
B
B
B
A
E
F
D
E
F
D
Содержание QS 142248
Страница 11: ......
Страница 12: ...Place first class postage here ...