background image

10

QUIETCOOLSYSTEMS.COM

3.3  Two Speed Wiring (for QC CL-6400)

1. 

For this installation, you will need (3) 2 wire Romex, an 8 Hour Timer, and a Double Stack Single Pole 
Switch.  

2. 

Using the 2-wire Romex from the first fan motor head, attach the black wire to the top gold screw 
on the right. Using the 2-wire Romex from the second fan motor head, attach the black wire to the 
bottom gold screw on the right. 

(see Figure 3.3A)

  

3. 

Attach the red wire from the 8 Hour Timer to the bottom black screw on the switch.  

4. 

Using the 2 wire Romex from your power source, tie the black wire to the black wire on the timer with 
a wire nut.  

5. 

Take a piece of bare copper wire and attach it to the green ground screw on the switch. Using a wire 
nut, tie all copper wires together with the green ground wire from the timer. Tie all the white wires 
together. Finish the installation of your switches and switch cover plate. 

6. 

Start by wiring the first motor head. Open up the handy box and take off all the wire nuts. Unscrew the 
green ground wire and detach the green ground wire from the power cord. Remove the power cord. 
Reattch the green ground wire to the handy box. Cut your green ground wire in half and strip both 
sides. 

(see Figure 3.3B)

 

7. 

Feed the 2 wire Romex into the handy box. Using the included wire nuts, tie the black wires together 
for high speed. Tie the remaining white neutral wires together. Tie your bare copper wires and green 
ground wires together. Carefully reinstall the handy box cover. 

8. 

Move to the second motor head. Open up the handy box and take off all the wire nuts. Unscrew the 
green ground wire and detach the green ground wire from the power cord. Remove the power cord. 
Reattach the green ground wire to the handy box. Cut your green ground wire in half and strip both 
sides. 

(see Figure 3.3B)

 

9. 

Feed the 2 wire Romex into the handy box. Using the included wire nuts, tie the black wires together 
for high speed. Tie the remaining white neutral wires together. Tie your bare copper wires and green 
ground wires together. Carefully reinstall the handy box cover.

Содержание CL-1500

Страница 1: ...1 QUIETCOOLSYSTEMS COM SEE HEAR FEEL THE QUIETCOOL DIFFERENCE THE NATURAL CHOICE FOR ENERGY SAVINGS OWNER S GUIDE ORIGINAL CLASSIC LINE...

Страница 2: ...ith insulation to reduce condensation 6 Heat The QuietCool system should be situated away from heat sources 7 Damage Requiring Service Only qualified service personnel should service the QuietCool sys...

Страница 3: ...vacuum cleaner running In contrast our QuietCool whole house fans average at just around 45 dB that s equivalent to quiet conversation The QuietCool system uses a cutting edge patented design to get...

Страница 4: ...RTANT 1 SQUARE FOOT OF NET FREE VENTING PER 750 CFM REQUIRED VENTILATION 1 SQ FT FOR EACH 750 CFM Vent Type Model Type Average Size Venting Sq Ft Gable vent 12 x 19 5 1 20 Dormer Vent 14 x 8 0 70 Eave...

Страница 5: ...e exact location for each fan Take the cardboard cut out template and a small screwdriver with you Make sure the template fits between the framing The rough opening size varies depending on which mode...

Страница 6: ...place mark its outline with a pencil NOTE Repeat these steps at each location 4 Using a drywall saw or similar device cut out the hole in the ceiling NOTE Repeat these steps at each location 5 Open a...

Страница 7: ...ither the drywall or the joist in the attic While holding it in place install a 1 3 8 drywall screw through the drywall into the flange of damper box on each side to temporarily hold the box in place...

Страница 8: ...from the home and particularly if not enough windows are open This could easily back draft gas appliances located inside your home 3 WIRING NOTE Wiring Diagrams are for examples only and wiring shoul...

Страница 9: ...g up the handy box Take off the wire nuts within the handy box Unscrew the green ground wire Detach the green ground wire from the power cord Remove the power cord Re attach the ground screw and wire...

Страница 10: ...Using the included wire nuts tie the black wire from the 2 wire power source to the black wire on the timer Tie the white neutral wire from the 2 wire power source to the white neutral wire on the ti...

Страница 11: ...Whole House Fan Tie All Ground Bare Copper Wires Together 14 2 Wire 8 HOUR 4 HOUR 2 HOUR 1 HOUR HOLD 14 3 Wire OFF Power Source Black Tied Together with Black Red Switch Leg High Low Two Speed Wiring...

Страница 12: ...head Open up the handy box and take off all the wire nuts Unscrew the green ground wire and detach the green ground wire from the power cord Remove the power cord Reattch the green ground wire to the...

Страница 13: ...gether with Black Red Switch Leg Off On On Off Two Speed Wiring Tie Common Wires Together Black Wires Whole House Fans Tie All Ground Bare Copper Wires Together 14 2 Wire 8 HOUR 4 HOUR 2 HOUR 1 HOUR H...

Страница 14: ...ndows will lessen the cooling breeze you feel The breeze will flow through your home and make its way to each QuietCool you have in operation As it gets later in the evening and even cooler outside yo...

Страница 15: ...ranty contact the dealer where you purchased the equipment If you are unable to find or reach your dealer contact Customer Service at QC Manufacturing Inc at the address below E Please register your p...

Страница 16: ...14 1 888 QUIETCOOL 43352 Business Park Drive Temecula CA 92590 PH 951 325 6340 QUIETCOOLSYSTEMS COM QuietCool is Proudly Designed and Built in California...

Отзывы: