ENGLISH (110-501)
110
ATTACHING OF IMPLEMENTS
- Move the locking lever in open position (left). This will
be easier if the loader beam is lifted, approx.1 m
(illustr.A).
- Lean tool carrier slightly forwards.
- Drive the loader towards the implement until the
implement hooks hitch the tool carrier (illustr.B).
Loaders with tool carrier EURO (8) and EURO-
COMBI
(CLICK-ON)
- Lift (approx.1 m) and crowd the implement. The
locking lever will be disengaged and the implement
automatically locked (illustr.C).
Loaders with tool carriers equipped with
manual locking
- Lift and crowd the implement. Lock the
implement by moving the lever to the right (illustr.D).
Loaders with tool carriers equipped with loose
latch bolts
- Lift and crowd the implement. Install the bolts and
secure with locking pins (illustr.E).
REMARK ! See the Mounting Instruction for the
hydraulic locking of implements
DETACHING OF IMPLEMENTS
Fig.F
- Lift the implement approx. 1 m.
- Lean the implement approx. 30° forwards.
- Move the locking lever to the left and remove the latch
bolts.
- Lower the implement to the ground. Reverse tractor.
Always check, when changing implements, that the
implement is properly locked in position by pushing the
front part of the implement against the ground.
WARNING
An implement of another origin than ÅLÖ may cause
damage to the loader. Therefore never fit an implement
of another make without making sure that the implement
is approved by ALÖ.
Содержание Q 900 Series
Страница 171: ...125 125 501...