BTR
Series
EN
QUICK
BTR Series
INSTALLATION AND USER’S MANUAL - REV 001C
11
4 - Installation
HULL
COUNTER FLANGE
STRUCTURAL GLUE
GRP LAYERS
GRP LAYERS
GRP LAYERS
GRP LAYERS
•
Align the counter flange with the opening of the hull and
check that the 4 heights indicated in fig.B page 9
are correct.
Apply resin to the counter flange or weld it, in the case of aluminium or steel, according to the techniques identified as the
most suitable for the type of hull construction (fig. 5).
HATCH
HULL
COUNTER FLANGE
•
On the entire perimeter of the hull opening, make a sturdy stop for closing the hatch (fig. 6).
4.2 - Construction and installation of the closing hatch
WARNING:
take special care to avoid interference between the cover and the hull opening.
Too precise contacts will cause damage to the entire movement system (fig.7).
Fig.7
Fig.8
45°
5 mm
HATCH
COUNTER FLANGE
HINGE SIDE
Quick
®
recommended
laminating system
Fig.6
Fig.5