•  If any part of this product becomes damaged, remove and discard the entire unit, and replace with a new one.  

Failure to do so could result in fire, property damage, personal injury, electrocution, or death.

•  When disconnecting the inverter, allow 15 minutes for all electrical storage components to discharge before 

servicing any conductors in that circuit.

•  Do not install this equipment in wet conditions.  This could result in electrocution, personal injury, or death.

•  Be aware of and work away from power lines.  Contact with power lines could result in electrocution, personal 

injury, or death.

•  Do not install if the roof is wet, frosted, or covered by ice or snow.  

•  Whenever drilling into an attic space, ensure that no electrical wires, conduit or electrical components are 

on the other side.  Failure to note electrical equipment locations could lead to damage which could result in 

electrocution, personal injury or death.

•  When determining ambient operating temperature, system designer must take into account external sources of 

heat such as irradiance from the sun or the environmental conditions under which the product is installed such 

as under a PV module. Exceeding the temperature rating could cause electrical failure or arching that could result 

in property damage, fire, electrocution, personal injury or death.
 

 

 

 

CAUTIONS

•  Do not exceed the maximum wire sizes specified in this manual.  

•  Use only wire combinations specified in this manual.

•  Use proper safety and personal protective equipment (PPE) such as goggles and safety glasses, gloves, ear 

protection, hard hats, safety harness and fall protection, etc.  Ensure you have proper training on how to use and 

install this equipment.  Follow all national and local regulations and best practices.  

•  The installation of this product involves working around high-voltage electrical equipment.  Follow applicable 

safety regulation and best practices to avoid creating an electrocution hazard.  

•  The installation of this product requires working on roofs.  Follow applicable safety regulations and best practices 

to avoid falling from the work area.  Take steps to prevent objects from falling off the roof.  Cordon off the area on 

the ground directly under where the roof work will take place or equipment/tools will be stored.  

•  Do not use this equipment in a manner other than that outlined in these instructions.  Doing so may cause 

damage to the equipment, or personal injury.

•  Never work alone.  Someone should always be in range of your voice or close enough to come to your aid in the 

event of an accident.  

•  Remove all rings, bracelets, necklaces, watches or other metal equipment that could become energized while 

working with electrical conductors and equipment.

•  The maximum operating temperature of this equipment is s 75°C. NOTE: this includes temperature rise over 

ambient due to irradiance from the sun. Qualified system designer and Engineer is responsible for identifying 

maximum temperature based upon site conditions.

Содержание QBox

Страница 1: ...QBox R E S P E C T T H E R O O F Patented Junction Box For Composition Asphalt Shingle Roofs Installation Manual Elevated Water Seal Technology U S Patent No 9 496 697 9 742 173...

Страница 2: ...ns 1 I II Safety Callouts 1 I III Safety Warnings and Cautions 2 II Product Description 4 II I Overview 4 I II Dimensions 4 I III QBox Contents 5 III Installation Overview 6 II I QBox Location 6 IV In...

Страница 3: ...is installation manual I I SAVE THESE INSTRUCTIONS This manual contains important instructions that shall be followed during installation and maintenance of the system This manual should be stored nea...

Страница 4: ...od service condition Nicked pinched or damaged wires can lead to electrocution or cause a fire Do not use wire connection devices other than those supplied with this equipment Using other non certifie...

Страница 5: ...cified in this manual Use only wire combinations specified in this manual Use proper safety and personal protective equipment PPE such as goggles and safety glasses gloves ear protection hard hats saf...

Страница 6: ...le and weather resistant polycarbonate With excellent impact resistance and a wide operating temperature range this product is suitable for all environments In addition since it is made of nonconducti...

Страница 7: ...eeds Strain relief fittings for PV homerun wires for sidewall pass through EMT conduit for transition wiring for attic pass through Conduit connectors and fittings for transition wiring for sidewall p...

Страница 8: ...nder a module that is easy to lift out of position for access III Installation Overview The QBox utilizes a patented waterproof pass through for EMT to run system wires through the roof into the attic...

Страница 9: ...nderside of deck in the attic Reinstall Flashing Reinstall the QBox assembly such that the conduit fitting in the center of the box aligns with the hole you created in step 4 IV Installation 5 Clean C...

Страница 10: ...s will hold the QBox flashing in place when securing it to the roof Secure to Roof Screw the anchor bolts with sealing washers through the mounting holes and into the roof sheathing securing the QBox...

Страница 11: ...be used to maintain an electrical bond between fittings Ensure all proper jumpers or other bonding mechanisms are in place per NEC The DC input and DC output circuits are isolated from the enclosure...

Страница 12: ...ieve one of the approved wiring combinations outlined in Section VI 10 8 Install Grommet Slide the grommet over the wires and push it down into the conduit such that it extends over the cut edge and l...

Страница 13: ...diagrams for all the approved use cases All wires are to be copper conductors with insulation rated to 90 C or higher Maximum size of incoming PV string wires is 10 AWG Maximum size of outgoing branc...

Страница 14: ...local and national codes 1 AQUA RED ONLY Strip wires 7 16 11 1mm 2 AQUA BLUE ONLY Strip wires 3 4 19 1mm 3 Align any frayed strands or conductors 4 Pre twisting is unnecessary Place stripped wires to...

Страница 15: ...D x 2 6 H Flashing 12 W x 12 D Ambient Operating Conditions 35 C 75 C Testing has shown that there is a 25 5 C increase in box temperature over ambient when wind speed is less than 1 mps and solar irr...

Страница 16: ...BI 7 2 3 44 Nov 2017 Rev 2 925 478 8269 2700 Mitchell Dr Walnut Creek CA 94598 2017 by Quick Mount PV All rights reserved R E S P E C T T H E R O O F www quickmountpv com tech quickmountpv com...